| TEMP ON HOUSE | David Hayes | | | |
|
| 30 DAY FOR TESTING | David Hayes | | | |
|
| SECOND ROUGH | Jan Trana | | | |
|
| SHOWER PAN | Jan Trana | | | |
|
| TUB ROUGH-IN | Jan Trana | | | |
|
| WALL SHEATHING | Wyatt T. Haygood | | | |
|
| DW SUBGRADE DENSITY | Perry Taborn | | | |
|
| SIDEWALK FORMS | Perry Taborn | | | |
|
| SIDEWALK SUB DENSITY | Perry Taborn | | | |
|
| ENG DRAINAGE | Perry Taborn | | | |
|
| BALCONY RAIL/GRILLE | Wyatt T. Haygood | | | |
|
| BLOWER DOOR TEST | Scott Wiesel | | | 3/17/2021 12:44:56 PM
ACH 50 3.0
|
|
| DRIVEWAY STEEL/PAVER | Wyatt T. Haygood | | | |
|
| ELECTRIC FINAL | David Hayes | | | |
|
| FINAL GAS-PLUMBING | Jan Trana | | | |
|
| FINAL SURVEY | ZONING | | | |
|
| IRRIGATION FINAL | Jan Trana | | | |
|
| IRRIGATION ROUGH | Jan Trana | | | |
|
| MECHANICAL FINAL | Scott Wiesel | | | |
|
| PATIO SLAB/PAVERS | Wyatt T. Haygood | | | |
|
| PLUMBING FINAL | Jan Trana | | | |
|
| SEWER FINAL | Jan Trana | | | |
|
| LANDSCAPING | Patti Hoot | | | |
|
| FINAL ENG INSPECTION | Perry Taborn | | | |
|
| ZONING INSPECTION | Jean Panebianco | | | |
|
| ADMIN POOL COMPLETE | Victoria Barrios | | | |
|
| FINAL | Wyatt T. Haygood | | | |
|
| ADMIN CHECKLIST** | Victoria Barrios | | | |
|
| MECHANICAL MISC | Scott Wiesel | | FIREPLACE | |
|
| TRUSS PLANS ON FILE | Wyatt T. Haygood | | SEE NOTES | 4/1/2021 9:31:02 AM
Contractor required to submit copy of Broward Elevator Permit
|
|
| LOW VOLTAGE FINAL | David Hayes | | TV,PHONE,ALARM,WIFI,LIGHTING,VAC,SPKS | |
|
| ELECTRIC FINAL | David Hayes | | GENERATOR | |
|
10/20/2021 | NOC | Marcia Turner | APPROVED | | |
|
11/01/2021 | TRUSS PLANS ON FILE | Debbie Grosse | APPROVED | SEE NOTES (SUBMITTED ONLY) | 9/30/2020 12:38:20 PM
Roof Truss System and Marcore Floor System Shop Drawings
|
|
11/02/2021 | TEMP POLE | CAP Gov EL | APPROVED | | 11/1/2021 3:50:30 PM
VB
|
|
11/02/2021 | NPDES INITIAL | Perry Taborn | APPROVED | | 11/1/2021 3:50:43 PM
VB
|
|
11/03/2021 | SLAB ELECTRIC | Dean DiBisceglie | CANCELLED BY DEPT | | |
|
11/03/2021 | SERVICE GROUND | Dean DiBisceglie | APPROVED | | 11/2/2021 4:47:18 PM
MT
|
|
11/03/2021 | FOOTER/FOUNDATION | Joseph Robinson | DISAPPROVED | | 10/21/2021 8:02:37 AM
Stemwall construction
11/2/2021 4:44:49 PM
MT
11/3/2021 4:49:22 PM
Job site layout does not match plans.
Submit change of plans.
|
|
12/28/2021 | GROUND ROUGH | Jan Trana | PARTIAL APPROVAL | | 12/23/2021 11:24:16 AM
JS
12/28/2021 1:11:43 PM
Pending venting shower and spa.
Ice maker drains information.
Need COP by top out. ISO/FLAT do not match approved plan.
|
|
12/29/2021 | CONDENSATE LINE | Dave Chin-Sang | APPROVED | | |
|
12/30/2021 | GROUND ROUGH | Jan Trana | APPROVED | | 12/28/2021 3:10:11 PM
wth
12/30/2021 12:13:17 PM
Need COP by final ISO/FLAT as built drawing.
Trap primers at final
12/30/2021 12:15:01 PM
Need COP by final ISO/FLAT as built drawing.
Trap primers at final
|
|
01/07/2022 | SLAB ELECTRIC | Joe Nieves | APPROVED | | |
|
04/12/2022 | SOIL TERMITE TREAT | Wyatt T. Haygood | APPROVED | | |
|
04/13/2022 | SOIL BEARING CERT | Wyatt T. Haygood | APPROVED | | |
|
| SEWER CONNECTION | Jan Trana | | | |
|
| WATER SERVICE | Jan Trana | | | |
|
04/15/2022 | SPOT SURVEY | Wyatt T. Haygood | APPROVED | | |
|
04/15/2022 | SLAB | Wyatt T. Haygood | DISAPPROVED | | 4/15/2022 10:42:48 AM
Work Covered without inspection.
engineer Approval Letter submitted to city of parkland building department references 2017 FBC. This permit is under FBC 2020.
Job Superintendent Sebastian Hegedus informed correction was required via phone call.
|
|
04/15/2022 | FOOTER/FOUNDATION | Wyatt T. Haygood | DISAPPROVED | | 4/15/2022 10:45:55 AM
Work Covered without inspection.
Engineer Approval Letter submitted to city of parkland building department references 2017 FBC. This permit is under FBC 2020.
Job Superintendent Sebastian Hegedus informed correction was required via phone call.
|
|
04/22/2022 | TIE BEAM/BOND | Will Jorge | DISAPPROVED | | 4/21/2022 1:31:42 PM
MT
4/22/2022 3:33:58 PM
need approved deck plan on site, need special inspector field report to include all aspects of areas to be poured, including all red iron and imbeds, inspection stopped
|
|
05/16/2022 | SLAB | Wyatt T. Haygood | APPROVED | | 5/16/2022 8:38:22 AM
Engineer approved
|
|
05/16/2022 | TIE BEAM/BOND | Wyatt T. Haygood | APPROVED | | 5/16/2022 8:40:41 AM
Engineer Approved
|
|
05/16/2022 | FOOTER/FOUNDATION | Wyatt T. Haygood | APPROVED | | 5/16/2022 8:42:49 AM
Engineer approved
|
|
05/16/2022 | 2ND FLOOR SLAB STR | Wyatt T. Haygood | APPROVED | | 4/29/2022 8:52:38 AM
LETTER RECEIVED FROM GEORGE HEGEDUS, PE, CERTIFYING MARCORE SLAB AND BEAMS
5/16/2022 9:03:13 AM
engineer approved
|
|
05/19/2022 | COLUMN | Joseph Robinson | APPROVED | Columns and Fill Cells | 5/18/2022 3:18:24 PM
Second Floor Columns and Fill Cells only
5/19/2022 1:23:36 PM
Fill cells and poured columns only.
|
|
06/09/2022 | 2ND FL TIE BEAM/BOND | Joseph Robinson | APPROVED | | 6/8/2022 8:31:17 AM
wth
|
|
07/18/2022 | ROOF SHEATHING | Wyatt T. Haygood | APPROVED | | 7/15/2022 2:14:14 PM
mt
|
|
07/28/2022 | TRUSS | Joseph Robinson | DISAPPROVED | | 7/27/2022 7:34:24 AM
wth
7/28/2022 5:54:47 PM
Approved set of truss plans required for inspection.
|
|
08/03/2022 | CONCRETE STAIRWELL | Alejandro Corrales | APPROVED | | 8/2/2022 9:37:27 AM
MT
8/3/2022 5:10:21 PM
Landing and upper portion of staircase approved
|
|
08/03/2022 | TRUSS | Alejandro Corrales | APPROVED | | 8/2/2022 9:37:02 AM
MT
|
|
08/08/2022 | TIN CAP | Joseph Robinson | APPROVED | | 8/5/2022 10:51:49 AM
MT
8/5/2022 10:52:27 AM
MT
|
|
08/11/2022 | HOT MOP IN PROGRESS | Joseph Robinson | DISAPPROVED | | 8/5/2022 10:53:05 AM
MT
8/11/2022 1:45:03 PM
Complete roofing permit package required for inspection.
|
|
08/30/2022 | HOT MOP IN PROGRESS | Joseph Robinson | APPROVED | PARTIAL | 8/29/2022 9:34:36 AM
VB
|
|
09/01/2022 | WIND/DOOR BUCK | Alejandro Corrales | PARTIAL APPROVAL | | 8/31/2022 11:26:36 AM
an
9/1/2022 1:53:14 PM
8 bucks inspected on 1st floor. 6 openings inspected on 2nd floor. See map on pages A1.0 and A2.0. Total of 14 openings approved
|
|
11/23/2022 | WIND/DOOR BUCK | Wyatt T. Haygood | CANCELLED BY PERMITE | | 11/21/2022 8:29:17 AM
ST
|
|
12/30/2022 | WIND/DOOR BUCK | Alejandro Corrales | APPROVED | | 12/29/2022 1:00:34 PM
CJ
12/30/2022 1:52:44 PM
Received engineer's repair letter to tighten the window and door openings using red iron columns. Many openings were over 6 inches too wide.
|
|
01/20/2023 | WIND/DOOR ATTACHMENT | Joseph Robinson | DISAPPROVED | | 1/19/2023 12:54:52 PM
CJ
1/20/2023 1:40:26 PM
No approved product approvals.
|
|
01/26/2023 | PRODUCT APPROVALS | Crystal Jones | APPROVED | SUBMITTED ONLY | |
|
01/31/2023 | WIND/DOOR ATTACHMENT | Joseph Robinson | CANCELLED BY DEPT | | 1/27/2023 1:48:14 PM
CJ
|
|
03/02/2023 | WIND/DOOR ATTACHMENT | Joseph Robinson | DISAPPROVED | | 3/1/2023 8:38:25 AM
CJ
3/2/2023 12:25:29 PM
5 openings inspected. Marked on plans.
No product approvals for ES 5000 windows installed.
Provide pictures of concealed anchors for sliding glass doors.
|
|
03/28/2023 | TILE IN PROGRESS | Wyatt T. Haygood | APPROVED | | 3/24/2023 1:29:38 PM
CJ
|
|
07/10/2023 | ROOF TILE UPLIFT TST | Wyatt T. Haygood | APPROVED | | |
|
07/19/2023 | ROOF FINAL | Alejandro Corrales | APPROVED | | 7/18/2023 11:51:55 AM
MT
|
|
07/24/2023 | ELECTRIC ROUGH | Rinor Krasniqi | PARTIAL APPROVAL | | 7/21/2023 9:42:44 AM
MT
7/24/2023 2:15:35 PM
EXTERIOR SOFFIT PASS ONLY
|
|
07/27/2023 | WIRE LATH | Anthony Crisanti | APPROVED | | 7/26/2023 12:24:20 PM
ST
|
|
08/09/2023 | ROUGH DUCT | Dave Chin-Sang | APPROVED | | 8/8/2023 11:14:21 AM
ST
|
|
08/10/2023 | EXHAUST ROUGH | Dave Chin-Sang | APPROVED | | |
|
| VENTILATION ROUGH | Scott Wiesel | | VOIDED (ME08 8/10/2023) | 8/10/2023 6:46:16 AM
Inspection voided by ME08.
|
|
11/16/2023 | WIND/DOOR ATTACHMENT | Anthony Crisanti | PARTIAL APPROVAL | | 11/15/2023 2:41:26 PM
JS
11/16/2023 4:26:27 PM
2nd window partial over the last 7 months.
Approved 11 windows today all marked and noted on plans
|
|
11/29/2023 | WIND/DOOR ATTACHMENT | Anthony Crisanti | CANCELLED BY PERMITE | | 11/28/2023 7:53:52 AM
FM
11/29/2023 7:48:12 AM
11-2
11/29/2023 2:20:21 PM
Not ready reschedule for tomorrow 11/30/23
|
|
11/30/2023 | WIND/DOOR ATTACHMENT | Anthony Crisanti | PARTIAL APPROVAL | | 11/30/2023 4:27:24 PM
47 window and door opening are completed they are all marked on master plan now and the other 7 will be completed next week when they will call in the final set.
|
|
12/05/2023 | WIND/DOOR ATTACHMENT | Anthony Crisanti | APPROVED | | 12/4/2023 12:06:13 PM
vb
12/5/2023 7:19:24 AM
9-12
|
|
12/05/2023 | UNIT MASONRY CERT | Bill Tracy | APPROVED | | 12/5/2023 3:52:33 PM
1ST AND 2ND FLOOR UNIT MASONRY INSPECTION LETTERS RECEIVED FROM GEORGE HEGEDUS, PE# 55477
|
|
12/07/2023 | GAS LINE RGH IN-PL | Jan Trana | DISAPPROVED | | 12/7/2023 12:33:56 PM
PERMIT CARD NOT POSTED
APPROVED PLAN NOT ON SITE
|
|
12/08/2023 | GAS LINE RGH IN-PL | Jan Trana | DISAPPROVED - FEE | | 12/7/2023 2:16:03 PM
vb
12/8/2023 10:17:11 AM
PERMIT CARD NOT POSTED
APPROVED PLAN NOT ON SITE
SECOND TIME
|
|
12/08/2023 | UNDERGROUND | Rinor Krasniqi | DISAPPROVED | GENERATOR | 12/7/2023 2:13:33 PM
FM
12/8/2023 12:23:08 PM
110.9.1 No Work
|
|
01/04/2024 | LOW VOLTAGE ROUGH | Rinor Krasniqi | DISAPPROVED | TV,PHONE,ALARM,WIFI,LIGHTING,VAC,SPKS | 1/3/2024 3:13:36 PM
MT
1/4/2024 12:00:16 PM
800.110 vertical support every 4' max
|
|
01/04/2024 | ELECTRIC ROUGH | Rinor Krasniqi | DISAPPROVED | | 1/5/2024 7:26:22 AM
362.24 ENT no more then 360 bends
300.21 prevent fire from spreading
300.4 protect cable from physical damage
334.30 secure cable within 12" of junction and every 4.5' thereafter
|
|
| ELECTRIC ROUGH | Rinor Krasniqi | | GENERATOR | |
|
01/09/2024 | ELECTRIC ROUGH | Rinor Krasniqi | APPROVED | | 1/9/2024 9:36:15 AM
JS
|
|
01/10/2024 | GAS LINE RGH IN-PL | Jan Trana | DISAPPROVED | | 1/9/2024 1:05:42 PM
MT
1/10/2024 1:43:45 PM
APPROVED PLAN NOT ON SITE
|
|
| GAS LINE RGH IN-PL | Jan Trana | | | |
|
01/10/2024 | TOP OUT | Jan Trana | DISAPPROVED | | 1/9/2024 1:04:47 PM
MT
1/10/2024 1:43:47 PM
APPROVED PLAN NOT ON SITE
|
|
01/23/2024 | GAS LINE RGH OUT-PL | Jan Trana | PARTIAL APPROVAL | | 1/23/2024 11:25:30 AM
Pending plans
|
|
01/23/2024 | TOP OUT | Jan Trana | PARTIAL APPROVAL | | 1/19/2024 9:27:33 AM
MT
1/23/2024 11:25:31 AM
Pending plans.
|
|
| TOP OUT | Jan Trana | | | |
|
01/26/2024 | FRAMING | Anthony Crisanti | CANCELLED BY PERMITE | | 1/25/2024 9:41:01 AM
FM
1/26/2024 7:25:22 AM
1-4
1/26/2024 1:05:28 PM
MT RESCHEDULED BY ANTHONY (INSPECTOR)
|
|
01/26/2024 | LOW VOLTAGE ROUGH | Joe Nieves | APPROVED | | 1/25/2024 11:18:00 AM
ST
|
|
01/29/2024 | FRAMING | Anthony Crisanti | APPROVED | 9 AM | 1/26/2024 1:06:16 PM
MT- 9 PER ANTHONY
|
|
02/01/2024 | INSULATION | Anthony Crisanti | APPROVED | | 1/31/2024 1:10:02 PM
MT
|
|
02/16/2024 | DRYWALL SCREW | Anthony Crisanti | APPROVED | | 2/16/2024 7:44:11 AM
FM
|
|
04/24/2024 | GAS LINE RGH OUT-PL | Jan Trana | PARTIAL APPROVAL | | 4/23/2024 11:25:10 AM
MT
4/24/2024 12:48:26 PM
Tank and driveway sleeve good to backfill.
|
|
| FINAL GAS-FIRE | Fire Inspector | | | |
|
| LP TANK ROUGH-FIRE | Fire Inspector | | | |
|
06/21/2024 | GAS LINE RGH OUT-PL | Jan Trana | APPROVED | | 6/17/2024 10:25:43 AM
vb
6/21/2024 1:16:20 PM
COP by final tank manufacturer
|
|
06/21/2024 | GASLINE RGH OUT-FIRE | Harold Alcalde | APPROVED | | 6/17/2024 10:25:52 AM
vb
|
|
07/12/2024 | UNDERGROUND | Joe Nieves | APPROVED | | 7/11/2024 11:02:52 AM
ST
7/12/2024 1:14:04 PM
UNDERGROUND INSPECTION FOR SERVICE/ A/C/ GENERATOR/ CONDUITS/APPROVED.
|
|
08/21/2024 | LP TANK ROUGH-PLUM | Jan Trana | APPROVED | | |
|