Permit No. BLDG2009-0145 Permit Type   SFR Site Address   7160 LEMON GRASS DR
PARKLAND, FL 33076
Applied   09/15/2020 Applicant  
Approved   10/08/2021 Owner   ALBANESE DEVELOPMENT PARKLAND
Issued   10/15/2021 Contractor   LEONARD ALBANESE & SONS BUILDERS, INC.
Parent Permit No.   Description   1/J PG&CC
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

TEMP ON HOUSEDavid Hayes

30 DAY FOR TESTINGDavid Hayes

SECOND ROUGHJan Trana

SHOWER PANJan Trana

TUB ROUGH-INJan Trana

WALL SHEATHINGWyatt T. Haygood

DW SUBGRADE DENSITYPerry Taborn

SIDEWALK FORMSPerry Taborn

SIDEWALK SUB DENSITYPerry Taborn

ENG DRAINAGEPerry Taborn

BALCONY RAIL/GRILLEWyatt T. Haygood

BLOWER DOOR TESTScott Wiesel3/17/2021 12:44:56 PM ACH 50 3.0

DRIVEWAY STEEL/PAVERWyatt T. Haygood

ELECTRIC FINALDavid Hayes

FINAL GAS-PLUMBINGJan Trana

FINAL SURVEYZONING

IRRIGATION FINALJan Trana

IRRIGATION ROUGHJan Trana

MECHANICAL FINALScott Wiesel

PATIO SLAB/PAVERSWyatt T. Haygood

PLUMBING FINALJan Trana

SEWER FINALJan Trana

LANDSCAPINGPatti Hoot

FINAL ENG INSPECTIONPerry Taborn

ZONING INSPECTIONJean Panebianco

ADMIN POOL COMPLETEVictoria Barrios

FINALWyatt T. Haygood

ADMIN CHECKLIST**Victoria Barrios

MECHANICAL MISCScott WieselFIREPLACE

TRUSS PLANS ON FILEWyatt T. HaygoodSEE NOTES4/1/2021 9:31:02 AM Contractor required to submit copy of Broward Elevator Permit

LOW VOLTAGE FINALDavid HayesTV,PHONE,ALARM,WIFI,LIGHTING,VAC,SPKS

ELECTRIC FINALDavid HayesGENERATOR

 10/20/2021NOCMarcia TurnerAPPROVED

 11/01/2021TRUSS PLANS ON FILEDebbie GrosseAPPROVEDSEE NOTES (SUBMITTED ONLY)9/30/2020 12:38:20 PM Roof Truss System and Marcore Floor System Shop Drawings

 11/02/2021TEMP POLECAP Gov ELAPPROVED11/1/2021 3:50:30 PM VB

 11/02/2021NPDES INITIALPerry TabornAPPROVED11/1/2021 3:50:43 PM VB

 11/03/2021SLAB ELECTRICDean DiBisceglieCANCELLED BY DEPT

 11/03/2021SERVICE GROUNDDean DiBisceglieAPPROVED11/2/2021 4:47:18 PM MT

 11/03/2021FOOTER/FOUNDATIONJoseph RobinsonDISAPPROVED10/21/2021 8:02:37 AM Stemwall construction 11/2/2021 4:44:49 PM MT 11/3/2021 4:49:22 PM Job site layout does not match plans. Submit change of plans.

 12/28/2021GROUND ROUGHJan TranaPARTIAL APPROVAL12/23/2021 11:24:16 AM JS 12/28/2021 1:11:43 PM Pending venting shower and spa. Ice maker drains information. Need COP by top out. ISO/FLAT do not match approved plan.

 12/29/2021CONDENSATE LINEDave Chin-SangAPPROVED

 12/30/2021GROUND ROUGHJan TranaAPPROVED12/28/2021 3:10:11 PM wth 12/30/2021 12:13:17 PM Need COP by final ISO/FLAT as built drawing. Trap primers at final 12/30/2021 12:15:01 PM Need COP by final ISO/FLAT as built drawing. Trap primers at final

 01/07/2022SLAB ELECTRICJoe NievesAPPROVED

 04/12/2022SOIL TERMITE TREATWyatt T. HaygoodAPPROVED

 04/13/2022SOIL BEARING CERTWyatt T. HaygoodAPPROVED

SEWER CONNECTIONJan Trana

WATER SERVICEJan Trana

 04/15/2022SPOT SURVEYWyatt T. HaygoodAPPROVED

 04/15/2022SLABWyatt T. HaygoodDISAPPROVED4/15/2022 10:42:48 AM Work Covered without inspection. engineer Approval Letter submitted to city of parkland building department references 2017 FBC. This permit is under FBC 2020. Job Superintendent Sebastian Hegedus informed correction was required via phone call.

 04/15/2022FOOTER/FOUNDATIONWyatt T. HaygoodDISAPPROVED4/15/2022 10:45:55 AM Work Covered without inspection. Engineer Approval Letter submitted to city of parkland building department references 2017 FBC. This permit is under FBC 2020. Job Superintendent Sebastian Hegedus informed correction was required via phone call.

 04/22/2022TIE BEAM/BONDWill JorgeDISAPPROVED4/21/2022 1:31:42 PM MT 4/22/2022 3:33:58 PM need approved deck plan on site, need special inspector field report to include all aspects of areas to be poured, including all red iron and imbeds, inspection stopped

 05/16/2022SLABWyatt T. HaygoodAPPROVED5/16/2022 8:38:22 AM Engineer approved

 05/16/2022TIE BEAM/BONDWyatt T. HaygoodAPPROVED5/16/2022 8:40:41 AM Engineer Approved

 05/16/2022FOOTER/FOUNDATIONWyatt T. HaygoodAPPROVED5/16/2022 8:42:49 AM Engineer approved

 05/16/20222ND FLOOR SLAB STRWyatt T. HaygoodAPPROVED4/29/2022 8:52:38 AM LETTER RECEIVED FROM GEORGE HEGEDUS, PE, CERTIFYING MARCORE SLAB AND BEAMS 5/16/2022 9:03:13 AM engineer approved

 05/19/2022COLUMNJoseph RobinsonAPPROVEDColumns and Fill Cells5/18/2022 3:18:24 PM Second Floor Columns and Fill Cells only 5/19/2022 1:23:36 PM Fill cells and poured columns only.

 06/09/20222ND FL TIE BEAM/BONDJoseph RobinsonAPPROVED6/8/2022 8:31:17 AM wth

 07/18/2022ROOF SHEATHINGWyatt T. HaygoodAPPROVED7/15/2022 2:14:14 PM mt

 07/28/2022TRUSSJoseph RobinsonDISAPPROVED7/27/2022 7:34:24 AM wth 7/28/2022 5:54:47 PM Approved set of truss plans required for inspection.

 08/03/2022CONCRETE STAIRWELLAlejandro CorralesAPPROVED8/2/2022 9:37:27 AM MT 8/3/2022 5:10:21 PM Landing and upper portion of staircase approved

 08/03/2022TRUSSAlejandro CorralesAPPROVED8/2/2022 9:37:02 AM MT

 08/08/2022TIN CAPJoseph RobinsonAPPROVED8/5/2022 10:51:49 AM MT 8/5/2022 10:52:27 AM MT

 08/11/2022HOT MOP IN PROGRESSJoseph RobinsonDISAPPROVED8/5/2022 10:53:05 AM MT 8/11/2022 1:45:03 PM Complete roofing permit package required for inspection.

 08/30/2022HOT MOP IN PROGRESSJoseph RobinsonAPPROVEDPARTIAL8/29/2022 9:34:36 AM VB

 09/01/2022WIND/DOOR BUCKAlejandro CorralesPARTIAL APPROVAL8/31/2022 11:26:36 AM an 9/1/2022 1:53:14 PM 8 bucks inspected on 1st floor. 6 openings inspected on 2nd floor. See map on pages A1.0 and A2.0. Total of 14 openings approved

 11/23/2022WIND/DOOR BUCKWyatt T. HaygoodCANCELLED BY PERMITE11/21/2022 8:29:17 AM ST

 12/30/2022WIND/DOOR BUCKAlejandro CorralesAPPROVED12/29/2022 1:00:34 PM CJ 12/30/2022 1:52:44 PM Received engineer's repair letter to tighten the window and door openings using red iron columns. Many openings were over 6 inches too wide.

 01/20/2023WIND/DOOR ATTACHMENTJoseph RobinsonDISAPPROVED1/19/2023 12:54:52 PM CJ 1/20/2023 1:40:26 PM No approved product approvals.

 01/26/2023PRODUCT APPROVALSCrystal JonesAPPROVEDSUBMITTED ONLY

 01/31/2023WIND/DOOR ATTACHMENTJoseph RobinsonCANCELLED BY DEPT1/27/2023 1:48:14 PM CJ

 03/02/2023WIND/DOOR ATTACHMENTJoseph RobinsonDISAPPROVED3/1/2023 8:38:25 AM CJ 3/2/2023 12:25:29 PM 5 openings inspected. Marked on plans. No product approvals for ES 5000 windows installed. Provide pictures of concealed anchors for sliding glass doors.

 03/28/2023TILE IN PROGRESSWyatt T. HaygoodAPPROVED3/24/2023 1:29:38 PM CJ

 07/10/2023ROOF TILE UPLIFT TSTWyatt T. HaygoodAPPROVED

 07/19/2023ROOF FINALAlejandro CorralesAPPROVED7/18/2023 11:51:55 AM MT

 07/24/2023ELECTRIC ROUGHRinor KrasniqiPARTIAL APPROVAL7/21/2023 9:42:44 AM MT 7/24/2023 2:15:35 PM EXTERIOR SOFFIT PASS ONLY

 07/27/2023WIRE LATHAnthony CrisantiAPPROVED7/26/2023 12:24:20 PM ST

 08/09/2023ROUGH DUCTDave Chin-SangAPPROVED8/8/2023 11:14:21 AM ST

 08/10/2023EXHAUST ROUGHDave Chin-SangAPPROVED

VENTILATION ROUGHScott WieselVOIDED (ME08 8/10/2023)8/10/2023 6:46:16 AM Inspection voided by ME08.

 11/16/2023WIND/DOOR ATTACHMENTAnthony CrisantiPARTIAL APPROVAL11/15/2023 2:41:26 PM JS 11/16/2023 4:26:27 PM 2nd window partial over the last 7 months. Approved 11 windows today all marked and noted on plans

 11/29/2023WIND/DOOR ATTACHMENTAnthony CrisantiCANCELLED BY PERMITE11/28/2023 7:53:52 AM FM 11/29/2023 7:48:12 AM 11-2 11/29/2023 2:20:21 PM Not ready reschedule for tomorrow 11/30/23

 11/30/2023WIND/DOOR ATTACHMENTAnthony CrisantiPARTIAL APPROVAL11/30/2023 4:27:24 PM 47 window and door opening are completed they are all marked on master plan now and the other 7 will be completed next week when they will call in the final set.

 12/05/2023WIND/DOOR ATTACHMENTAnthony CrisantiAPPROVED12/4/2023 12:06:13 PM vb 12/5/2023 7:19:24 AM 9-12

 12/05/2023UNIT MASONRY CERTBill TracyAPPROVED12/5/2023 3:52:33 PM 1ST AND 2ND FLOOR UNIT MASONRY INSPECTION LETTERS RECEIVED FROM GEORGE HEGEDUS, PE# 55477

 12/07/2023GAS LINE RGH IN-PLJan TranaDISAPPROVED12/7/2023 12:33:56 PM PERMIT CARD NOT POSTED APPROVED PLAN NOT ON SITE

 12/08/2023GAS LINE RGH IN-PLJan TranaDISAPPROVED - FEE12/7/2023 2:16:03 PM vb 12/8/2023 10:17:11 AM PERMIT CARD NOT POSTED APPROVED PLAN NOT ON SITE SECOND TIME

 12/08/2023UNDERGROUNDRinor KrasniqiDISAPPROVEDGENERATOR12/7/2023 2:13:33 PM FM 12/8/2023 12:23:08 PM 110.9.1 No Work

 01/04/2024LOW VOLTAGE ROUGHRinor KrasniqiDISAPPROVEDTV,PHONE,ALARM,WIFI,LIGHTING,VAC,SPKS1/3/2024 3:13:36 PM MT 1/4/2024 12:00:16 PM 800.110 vertical support every 4' max

 01/04/2024ELECTRIC ROUGHRinor KrasniqiDISAPPROVED1/5/2024 7:26:22 AM 362.24 ENT no more then 360 bends 300.21 prevent fire from spreading 300.4 protect cable from physical damage 334.30 secure cable within 12" of junction and every 4.5' thereafter

ELECTRIC ROUGHRinor KrasniqiGENERATOR

 01/09/2024ELECTRIC ROUGHRinor KrasniqiAPPROVED1/9/2024 9:36:15 AM JS

 01/10/2024GAS LINE RGH IN-PLJan TranaDISAPPROVED1/9/2024 1:05:42 PM MT 1/10/2024 1:43:45 PM APPROVED PLAN NOT ON SITE

GAS LINE RGH IN-PLJan Trana

 01/10/2024TOP OUTJan TranaDISAPPROVED1/9/2024 1:04:47 PM MT 1/10/2024 1:43:47 PM APPROVED PLAN NOT ON SITE

 01/23/2024GAS LINE RGH OUT-PLJan TranaPARTIAL APPROVAL1/23/2024 11:25:30 AM Pending plans

 01/23/2024TOP OUTJan TranaPARTIAL APPROVAL1/19/2024 9:27:33 AM MT 1/23/2024 11:25:31 AM Pending plans.

TOP OUTJan Trana

 01/26/2024FRAMINGAnthony CrisantiCANCELLED BY PERMITE1/25/2024 9:41:01 AM FM 1/26/2024 7:25:22 AM 1-4 1/26/2024 1:05:28 PM MT RESCHEDULED BY ANTHONY (INSPECTOR)

 01/26/2024LOW VOLTAGE ROUGHJoe NievesAPPROVED1/25/2024 11:18:00 AM ST

 01/29/2024FRAMINGAnthony CrisantiAPPROVED9 AM1/26/2024 1:06:16 PM MT- 9 PER ANTHONY

 02/01/2024INSULATIONAnthony CrisantiAPPROVED1/31/2024 1:10:02 PM MT

 02/16/2024DRYWALL SCREWAnthony CrisantiAPPROVED2/16/2024 7:44:11 AM FM

 04/24/2024GAS LINE RGH OUT-PLJan TranaPARTIAL APPROVAL4/23/2024 11:25:10 AM MT 4/24/2024 12:48:26 PM Tank and driveway sleeve good to backfill.

FINAL GAS-FIREFire Inspector

LP TANK ROUGH-FIREFire Inspector

 06/21/2024GAS LINE RGH OUT-PLJan TranaAPPROVED6/17/2024 10:25:43 AM vb 6/21/2024 1:16:20 PM COP by final tank manufacturer

 06/21/2024GASLINE RGH OUT-FIREHarold AlcaldeAPPROVED6/17/2024 10:25:52 AM vb

 07/12/2024UNDERGROUNDJoe NievesAPPROVED7/11/2024 11:02:52 AM ST 7/12/2024 1:14:04 PM UNDERGROUND INSPECTION FOR SERVICE/ A/C/ GENERATOR/ CONDUITS/APPROVED.

 08/21/2024LP TANK ROUGH-PLUMJan TranaAPPROVED