09/07/2024
10:44 PM
 
Permit No. BLDG2210-0237 Permit Type   ADDITION Site Address   7860 NW 84 AVE
PARKLAND, FL 330671074
Applied   10/31/2022 Applicant  
Approved   03/20/2023 Owner   COHEN,ILAN & LAUREN
Issued   06/23/2023 Contractor   KITCHEN & HOME IMPROVEMENTS
Parent Permit No.   Description   2 BDRMS/1 BTHRM
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 06/28/2023NOCStephanie TaylorAPPROVED

 07/03/2023GROUND ROUGHJeremy HassenplugDISAPPROVED6/30/2023 9:34:59 AM FM 7/3/2023 9:38:11 AM No water in sanitary

 07/05/2023GROUND ROUGHJeremy HassenplugAPPROVED7/3/2023 9:39:58 AM FM

 07/19/2023SOIL TERMITE TREATWyatt T. HaygoodAPPROVED7/19/2023 2:27:23 PM Soil Termite Treatment and Soil Compaction Test results submitted.

 07/21/2023SOIL BEARING CERTWyatt T. HaygoodAPPROVED

 07/24/2023SERVICE GROUNDRinor KrasniqiAPPROVED7/21/2023 2:47:26 PM wth

 08/30/2023TRUSS PLANS ON FILEBill TracyAPPROVED

 10/12/2023SPOT SURVEYBill TracyDISAPPROVED10/12/2023 4:51:40 PM SLAB SPOT SURVEY REQUIRED TO INCLUDE FINISHED FLOOR ELEVATION FOR THE NEW WORK. PLEASE CLEARLY INDICATE THE FLOOR ELEVATION FOR THE ADDITION. FBC 107.3.5(A)(8)

 10/17/2023SPOT SURVEYZONINGDISAPPROVED10/17/2023 12:39:08 PM NO- PROVIDE FRONT SETBACK TIES TO NEW ADDITION. 75' MINIMUM REQUIRED. CONTACT GAYLE IN PLANNING & ZONING AT (954)757-4159 OR GEASTERLING@CITYOFPARKLAND.ORG

 10/27/2023SPOT SURVEYBill TracyAPPROVED

 11/09/2023WIND/DOOR BUCKAnthony CrisantiAPPROVED

 11/14/2023RAKE BEAMJoseph RobinsonDISAPPROVED11/14/2023 5:02:31 PM Steel at corners of beams must be continuous. Work incomplete.

 11/15/2023RAKE BEAMJoseph RobinsonDISAPPROVED11/15/2023 4:29:08 PM Work not ready due to weather.

 11/16/2023RAKE BEAMJoseph RobinsonAPPROVED

 01/11/2024CONDENSATE LINEDave Chin-SangDISAPPROVED1/11/2024 10:06:53 AM Inspector PL09 changed the inspection assignment from PL09 to ME08 1/11/2024 10:15:06 AM Not to plan. Cop required. Overhead line ran

 01/18/2024WATER SERVICEJan TranaAPPROVED1/17/2024 9:42:21 AM ST

 02/15/2024CONDENSATE LINEScott WieselAPPROVED2/14/2024 1:45:04 PM FM

 07/24/2023SLABJoseph RobinsonDISAPPROVED7/21/2023 2:47:06 PM wth 7/24/2023 2:43:22 PM Approved plans required for this inspection.

 09/01/2023SLABAnthony CrisantiAPPROVED8/31/2023 10:01:52 AM JS 9/1/2023 12:21:33 PM Change of plan required showing an area of wall that already exist in the original house as not being new. Note there is a small jog in the slab layout that is mistaken as new as the existing house is already there. 9/1/2023 12:22:45 PM Change of plan required showing an area of wall that already exist in the original house as not being new. Note there is a small jog in the slab layout that is mistaken as new as the existing house is already there.

 10/17/2023TIE BEAM/BONDJoseph RobinsonDISAPPROVED10/16/2023 4:02:05 PM VB 10/17/2023 4:28:17 PM Provide letter from special inspector. Have engineer address 4" wall connection tying into house.

 10/23/2023TIE BEAM/BONDJoseph RobinsonAPPROVED10/20/2023 2:38:17 PM MT

 10/16/2023TIE BEAM/BONDJoseph RobinsonDISAPPROVED10/13/2023 3:34:26 PM FM 10/16/2023 3:59:34 PM Tie beam must have 4 bars epoxied into existing beam. Currently only 4 bars on one side of house. All steel drilled into house must be epoxied. One side of the beam has steel without epoxy. Work incomplete

 03/05/2024DRYWALL SCREWJoseph RobinsonPARTIAL APPROVAL3/5/2024 2:17:37 PM Pending new door opening to existing house and A/C closet (no dry wall on ceiling and 1 wall).

 03/14/2024DRYWALL SCREWJoseph RobinsonAPPROVED3/13/2024 3:10:42 PM FM

 03/04/2024DRYWALL SCREWAnthony CrisantiCANCELLED BY PERMITE3/1/2024 9:35:14 AM FM 3/4/2024 7:24:40 AM 9-11

 02/16/2024ELECTRIC ROUGHPedro VieiraAPPROVED2/15/2024 12:25:10 PM JS

 02/14/2024ELECTRIC ROUGHRinor KrasniqiDISAPPROVED2/14/2024 3:22:56 PM 250.4 bring UFER in panel 352.30 1.25" PVC shall be secured within 5' 210.52 outlets every 6' then 12' thereafter on walls 2' or larger 312.2 ACU disconnect 1/4" off wall for air space

 01/11/2024ELECTRIC ROUGHPedro VieiraDISAPPROVED1/10/2024 2:26:48 PM ST 1/11/2024 11:20:52 AM Not per plan COP required Job not complete

 01/11/2024EXHAUST ROUGHDave Chin-SangAPPROVED1/10/2024 2:27:06 PM ST

 02/20/2024FRAMINGTony WillsonDISAPPROVED2/16/2024 2:57:03 PM FM 2/20/2024 7:22:23 AM Inspector BD40 changed the inspection assignment from BD40 to BD37 2/20/2024 12:14:17 PM Many areas needed to be sealed at exterior wall ceilings. Draft Stop / Foam. FBC 110.9.1

 02/21/2024FRAMINGAnthony CrisantiAPPROVED2/20/2024 2:24:51 PM FM

 02/15/2024HOT MOP IN PROGRESSAnthony CrisantiDISAPPROVED2/15/2024 7:24:48 AM 8-11 2/15/2024 12:11:17 PM Not ready complete the whole roof then recall inspection 2/15/2024 12:32:02 PM Not ready complete the whole roof then recall inspection

 12/13/2023HOT MOP IN PROGRESSJoseph RobinsonCANCELLED BY PERMITE12/12/2023 1:59:44 PM FM 12/13/2023 7:21:33 AM Inspector BD40 changed the inspection assignment from BD40 to BD37

 12/20/2023HOT MOP IN PROGRESSJoseph RobinsonDISAPPROVED12/19/2023 1:26:42 PM vb 12/20/2023 1:19:49 PM No ladder.

 03/06/2024HOT MOP IN PROGRESSTony WillsonAPPROVED3/5/2024 1:54:08 PM FM

 12/21/2023HOT MOP IN PROGRESSJoseph RobinsonDISAPPROVED12/20/2023 3:49:08 PM JS 12/21/2023 7:28:13 AM Inspector BD40 changed the inspection assignment from BD40 to BD37 12/21/2023 11:50:15 AM Complete peel and stick.

 02/26/2024INSULATIONJoseph RobinsonAPPROVED2/23/2024 10:58:39 AM FM

 01/11/2024LOW VOLTAGE ROUGHPedro VieiraAPPROVED1/10/2024 2:38:14 PM ST

 11/22/2023PRODUCT APPROVALSBill TracyAPPROVED

 04/02/2024ROOF TILE UPLIFT TSTBill TracyAPPROVED4/2/2024 5:04:35 PM UPLIFT REPORT FROM CARLAB INC. - PASS

 03/21/2024TILE IN PROGRESSAnthony CrisantiAPPROVED3/20/2024 2:35:41 PM FM

 12/20/2023TIN CAPJoseph RobinsonDISAPPROVED12/19/2023 1:26:51 PM vb 12/20/2023 1:19:47 PM No ladder.

 12/21/2023TIN CAPJoseph RobinsonAPPROVED12/20/2023 3:49:31 PM JS 12/21/2023 7:28:03 AM Inspector BD40 changed the inspection assignment from BD40 to BD37

 12/13/2023TIN CAPJoseph RobinsonCANCELLED BY PERMITE12/12/2023 1:59:29 PM FM 12/13/2023 7:21:22 AM Inspector BD40 changed the inspection assignment from BD40 to BD37

 01/17/2024TOP OUTJan TranaAPPROVED1/16/2024 10:47:42 AM MT

 01/11/2024TOP OUTJan TranaCANCELLED BY PERMITE1/10/2024 2:27:33 PM ST 1/11/2024 9:04:12 AM MT-CX BY CLAUDIO

 11/29/2023ROOF SHEATHINGJoseph RobinsonAPPROVED11/28/2023 8:12:57 AM FM

 02/14/2024ROUGH DUCTScott WieselAPPROVED

 01/11/2024ROUGH DUCTDave Chin-SangDISAPPROVED1/11/2024 10:10:23 AM Duct layout not to plan Flex duct inner core not sealed FBC Energy Table 403.2.9.2 COP required for Ductwork Additional support required for flex duct

 12/14/2023TRUSSJoseph RobinsonAPPROVED12/13/2023 8:49:19 AM MT

 12/13/2023TRUSSJoseph RobinsonCANCELLED BY PERMITE12/12/2023 2:20:28 PM MT 12/13/2023 7:21:09 AM Inspector BD40 changed the inspection assignment from BD40 to BD37

 11/29/2023TRUSSJoseph RobinsonDISAPPROVED11/28/2023 8:13:12 AM FM 11/29/2023 5:25:53 PM Provide truss certification letter.

 11/29/2023WALL SHEATHINGJoseph RobinsonAPPROVED

 12/06/2023WIND/DOOR ATTACHMENTJoseph RobinsonAPPROVED12/5/2023 10:23:24 AM FM

 01/17/2024WIRE LATHJoseph RobinsonAPPROVED1/16/2024 7:46:38 AM VB

 01/11/2024WIRE LATHJoseph RobinsonDISAPPROVED1/10/2024 2:29:19 PM ST 1/11/2024 1:29:17 PM Patch all exposed rebar in tie beam. Work incomplete.

 04/08/2024ROOF FINALTony WillsonDISAPPROVED4/4/2024 10:21:11 AM ST 4/5/2024 8:24:39 AM FM 4/8/2024 5:04:04 PM It appears that most of the roof tiles were mechanically attached not foam adhesive attached like the roof specs show. There are some signs of adhesive foam being used but, the color of the foam doesn't look like the proper product. Polyset AH-160 is what should have been used for all roof tile attachments. FBC 110.9.1

 07/03/2024ELECTRIC FINALJoe NievesAPPROVED7/2/2024 8:42:46 AM MT

 07/03/2024PLUMBING FINALScott WieselDISAPPROVED7/2/2024 8:42:22 AM MT 7/3/2024 11:02:49 AM No entry,left message on contractors phone

 07/03/2024MECHANICAL FINALScott WieselDISAPPROVED7/2/2024 8:42:05 AM MT 7/3/2024 11:02:51 AM No entry,left message on contractor's phone

 07/03/2024UNIT MASONRY CERTBill TracyAPPROVED7/3/2024 12:14:28 PM unit masonry certification from Yves Lubin PE 61745

 07/05/2024SEWER CONNECTIONScott WieselAPPROVED7/3/2024 12:39:19 PM vb

 07/05/2024PLUMBING FINALScott WieselAPPROVED7/3/2024 12:39:54 PM vb

 07/05/2024MECHANICAL FINALScott WieselAPPROVED7/3/2024 12:39:40 PM vb

 07/08/2024LOW VOLTAGE FINALJoe NievesAPPROVED7/8/2024 9:14:28 AM LOW VOLTAGE FINAL NOT REQUIRED/APPROVED

 07/08/2024ROOF FINALBill TracyAPPROVED7/8/2024 2:33:54 PM UPLIFT REPORT SUBMITTED FOR FOAM ATTACHMENT

 07/10/2024ZONING INSPECTIONJean PanebiancoAPPROVED7/8/2024 2:57:54 PM MT

 07/16/2024FINAL SURVEYBill TracyDISAPPROVED7/16/2024 12:23:12 PM THIS TASK REQUIRES AN ELEVATION CERTICATE SUBMITTED WITH THE FINAL SURVEY TO VERIFY COMPLIANCE WITH FLOOD REGULATIONS. FBC 110.3(A)(26)(a) ELEVATIONS SHOWN ON SURVEY APPEAR TO BE INCORRECT - F.F.E. IS DISPLAYED AT 127.50, WHICH IS ABOUT 110 FEET TOO HIGH FOR THIS AREA. SURVEY IS NOT SIGNED/SEALED BY SURVEYOR

 07/17/2024FINAL SURVEYBill TracyAPPROVED7/17/2024 1:54:57 PM FINAL SURVEY AND EC SUBMITTED

 07/18/2024FINALJoseph RobinsonAPPROVED7/17/2024 1:59:46 PM ST

 07/18/2024ADMIN CHECKLIST**Victoria BarriosAPPROVED