08/18/2023 | NOC | Victoria Barrios | APPROVED | | |
|
09/01/2023 | NPDES INITIAL | Perry Taborn | DISAPPROVED | | 8/31/2023 2:32:02 PM
MT
9/1/2023 11:49:18 AM
Entrench silt fence at lake slope , and protect catch basin from construction activity , this street was recently paved. Make an effort to mitigate damage from your work
|
|
09/05/2023 | NPDES INITIAL | Perry Taborn | DISAPPROVED | | 9/1/2023 1:52:10 PM
MT
9/5/2023 2:39:52 PM
silt fence not installed correctly , see detail in your permit package
|
|
09/06/2023 | NPDES INITIAL | Perry Taborn | APPROVED | | 9/5/2023 3:44:19 PM
JS
|
|
09/07/2023 | MAIN DRAIN | Jan Trana | APPROVED | | 9/6/2023 1:54:48 PM
JS
|
|
09/07/2023 | POOL STEEL | Anthony Crisanti | APPROVED | | 9/6/2023 1:54:57 PM
JS
|
|
09/07/2023 | ELEC POOL STEEL BOND | Pedro Vieira | APPROVED | | 9/6/2023 1:54:38 PM
JS
|
|
09/25/2023 | PERIMETER PIPING | Jan Trana | APPROVED | | 9/22/2023 10:09:12 AM
FM
|
|
09/25/2023 | UNDERGROUND | Joe Nieves | APPROVED | | 9/22/2023 10:09:27 AM
FM
|
|
10/10/2023 | DECK BOND | Rinor Krasniqi | APPROVED | | |
|
11/09/2023 | ENG ROUGH GRADE | Perry Taborn | APPROVED | | 11/8/2023 2:34:42 PM
Giulliane Nobre
Giulliane Nobre
Aquafresh Pools
(954) 979-6444
www.aquafreshpools.com
11/9/2023 7:43:41 AM
Restore lake slope and restore swales to match existing grade at property line
|
|
11/09/2023 | DECK STEEL/PAVERS | Anthony Crisanti | APPROVED | | 11/8/2023 2:34:24 PM
Giulliane Nobre
Giulliane Nobre
Aquafresh Pools
(954) 979-6444
www.aquafreshpools.com
|
|
11/14/2023 | FENCE BOND | Pedro Vieira | APPROVED | | 11/13/2023 2:03:37 PM
Giulliane Nobre
Aquafresh Pools
(954) 979-6444
www.aquafreshpools.com
11/14/2023 9:29:07 AM
N/R
|
|
11/14/2023 | SAFETY ACT 515 | Anthony Crisanti | APPROVED | | 11/13/2023 2:03:47 PM
Giulliane Nobre
Aquafresh Pools
(954) 979-6444
www.aquafreshpools.com
|
|
11/14/2023 | FENCE | Anthony Crisanti | APPROVED | | 11/13/2023 2:03:26 PM
Giulliane Nobre
Aquafresh Pools
(954) 979-6444
www.aquafreshpools.com
|
|
11/16/2023 | ELECTRIC FINAL | Pedro Vieira | PARTIAL APPROVAL | | 11/16/2023 9:32:09 AM
For final approval, need inspection on feeder run and inside the jbox
|
|
11/29/2023 | ELECTRIC FINAL | Pedro Vieira | PARTIAL APPROVAL | | 11/28/2023 3:43:32 PM
JS
11/29/2023 11:21:55 AM
Inspector EL18 changed the inspection assignment from EL18 to EL16
11/29/2023 11:38:26 AM
Partial Approval Final
Pending expansion fitting on the outside PVC pipe run.
|
|
12/05/2023 | ELECTRIC FINAL | Joe Nieves | APPROVED | | |
|
12/12/2023 | ENG MISC | Perry Taborn | APPROVED | | 12/11/2023 3:49:04 PM
JS
|
|
12/12/2023 | PLUMBING POOL FINAL | Jan Trana | APPROVED | | 12/11/2023 3:50:38 PM
JS
|
|
12/12/2023 | LANDSCAPING | Patti Hoot | APPROVED | TREES LAND2308-0105; TURF 2309-0216 | 12/11/2023 3:49:14 PM
JS
|
|
02/01/2024 | FINAL SURVEY | Bill Tracy | APPROVED | | 2/1/2024 6:03:13 PM
AH11+1 NAVD FLOOD ZONE - 12.08 TO POOL EDGE
|
|
02/05/2024 | FINAL** | Anthony Crisanti | APPROVED | | 2/2/2024 1:57:40 PM
FM
2/5/2024 7:41:16 AM
9-12
|
|