| 30 DAY FOR TESTING | Steve Mitchell | | | |
|
| CONDENSATE LINE | Rowdy Gifford | | | |
|
03/08/2017 | NPDES INITIAL | Perry Taborn | CANCELLED BY DEPT | | 3/8/2017 8:29:05 AM
QUALIFIERS LICENSE EXPIRED SENT AN EMAIL AT 3:15 ON 3/7/17.
|
|
| SEWER CONNECTION | Rowdy Gifford | | | |
|
| TEMP ON HOUSE | David Hayes | | | |
|
12/15/2016 | NOC | Marilyn Blancett | APPROVED | | |
|
02/12/2018 | GROUND ROUGH | Jan Trana | APPROVED | | |
|
08/22/2017 | SERVICE GROUND | Dean DiBisceglie | APPROVED | | |
|
03/06/2018 | SLAB ELECTRIC | Carmen Di Paula | DISAPPROVED | | 3/6/2018 3:36:25 PM
FBC 110.9.1 not installed correctly.
|
|
11/15/2017 | SOIL BEARING CERT | Bill Tracy | APPROVED | | 11/15/2017 2:42:33 PM
Soil Bearing re-submitted on 11/13/17
2500 psf with 95% compaction
|
|
12/11/2017 | TRUSS PLANS ON FILE | Debbie Grosse | APPROVED | SUBMITTED ONLY | |
|
| WATER SERVICE | Rowdy Gifford | | | |
|
12/21/2017 | SOIL TERMITE TREAT | Gerald Solenski | APPROVED | | 12/21/2017 1:33:31 PM
nov 11 2017 horz slab
12/21/2017 1:33:32 PM
nov 11 2017 horz slab
|
|
03/09/2018 | SLAB | Wyatt T. Haygood | CANCELLED BY DEPT | | 3/9/2018 8:05:21 AM
Failed Slab electric
Note: slab electric required to be approved prior to this inspection.
|
|
03/09/2018 | PRODUCT APPROVALS | Wyatt T. Haygood | APPROVED | Submitted only | |
|
06/27/2018 | SPOT SURVEY | Wyatt T. Haygood | DISAPPROVED | | 6/27/2018 5:09:19 PM
1. Survey required to be original signed with raised seal.
F.S. 472.025
2. Provide Finish Floor Elevation for home and garage on survey.
3. Provide highest crown of road elevation on survey.
|
|
07/13/2018 | TIE BEAM/BOND | Will Jorge | DISAPPROVED | | 6/7/2018 1:17:13 PM
First Lift Special Inspector report inserted into city file
7/13/2018 7:43:05 AM
no window sills installed, missing fill cell at front bay window, no steel beam embeds installed, window opening lintels front of house wrong elevation, provide detail for front of house opening elevations, no dowels for second story, PVC stack in UT room masonry wall open to beam above, missing double fill cells, inspection stopped
|
|
| GAS LINE RGH IN-PL | Rowdy Gifford | | | |
|
12/20/2019 | ROOF SHEATHING | Will Jorge | PARTIAL APPROVAL | NEED ROOF PERMIT | 12/20/2019 12:17:20 PM
Pending roofing permit, and Porte cache at entry tie in not done, lower and balance of upper ok to dry in.
|
|
07/24/2020 | WIND/DOOR BUCK | Bill Tracy | APPROVED | | |
|
02/05/2020 | TIN CAP | Will Jorge | APPROVED | | 2/4/2020 3:16:30 PM
wth
|
|
03/10/2020 | HOT MOP IN PROGRESS | Will Jorge | APPROVED | | 3/10/2020 3:00:36 PM
90#
|
|
07/20/2020 | FRAMING | Wyatt T. Haygood | DISAPPROVED | WYATT ONLY | 7/17/2020 1:16:24 PM
JS
7/21/2020 7:07:29 AM
work not complete and ready for inspection.
|
|
08/25/2020 | TILE IN PROGRESS | Will Jorge | APPROVED | | 8/25/2020 3:13:38 PM
foam
|
|
| ELECTRIC FINAL | Steve Mitchell | | | |
|
| FINAL GAS-PLUMBING | Rowdy Gifford | | | |
|
| FINAL SURVEY | Marilyn Blancett | | | |
|
| IRRIGATION FINAL | Rowdy Gifford | | | |
|
| IRRIGATION ROUGH | Rowdy Gifford | | | |
|
| LANDSCAPING | Patti Hoot | | 96 TREES 14'x6'x3" OR $36,000 | 12/15/2015 11:13:33 AM
H/O REMOVING ADDITIONAL 60 TREES.
TOTAL TREE REPLACEMENT IS 96 TREES OR $36,000 OR COMBINATION.
|
|
| MECHANICAL FINAL | Scott Wiesel | | | |
|
| PLUMBING FINAL | Rowdy Gifford | | | |
|
| SEWER FINAL | Rowdy Gifford | | | |
|
| ZONING INSPECTION | Damian Brink | | | |
|
| ENG DRAINAGE | Perry Taborn | | | |
|
| ADMIN POOL COMPLETE | Marilyn Blancett | | | |
|
| FINAL | Michael Guerasio | | | |
|
| ADMIN CHECKLIST** | Marilyn Blancett | | | |
|
12/22/2017 | FOOTER/FOUNDATION | Will Jorge | APPROVED | | 12/22/2017 12:24:09 PM
Perimeter stem wall footer, no pads or interior
|
|
03/13/2018 | SLAB | Will Jorge | DISAPPROVED | | 3/12/2018 3:54:09 PM
l
3/13/2018 1:09:57 PM
Sanitation line in middle of footer plastic draped over ( too much concrete displacement) cut plastic fit under line with tape sleeve line for pour. Need COP for cast in place in lieu of block bond beam
|
|
07/06/2018 | SPOT SURVEY | Wyatt T. Haygood | APPROVED | | |
|
| FRAMING | Wyatt T. Haygood | | | |
|
| ENG DRIVEWAY | Perry Taborn | | | |
|
| DW SUBGRADE DENSITY | Perry Taborn | | | |
|
12/02/2019 | CONSULTATION | Will Jorge | APPROVED | | 12/2/2019 12:23:37 PM
30 day extension, plywood to be replaced, inspected and covered, per Building Official
|
|
02/05/2020 | ROOF SHEATHING | Will Jorge | APPROVED | | 2/4/2020 3:18:04 PM
wth
|
|
10/02/2018 | TIE BEAM/BOND | Will Jorge | APPROVED | | 10/2/2018 5:00:38 PM
Embeds must be installed at correct location and elevation
|
|
03/15/2018 | SLAB | Will Jorge | APPROVED | | 3/14/2018 3:26:02 PM
AT
|
|
03/12/2018 | SLAB ELECTRIC | Carmen Di Paula | APPROVED | | |
|
12/20/2019 | WALL SHEATHING | Will Jorge | APPROVED | | 12/20/2019 12:25:58 PM
upper level wood frame walls ok to dry in. strapping inspected
|
|
08/21/2018 | TIE BEAM/BOND | Will Jorge | DISAPPROVED | | 8/21/2018 2:19:04 PM
No beam plan in structurals, tin cap in place where embeds gets poured solid, inspection stopped
|
|
03/16/2017 | NPDES INITIAL | Perry Taborn | APPROVED | | |
|
12/22/2016 | TEMP POLE | Dean DiBisceglie | APPROVED | | |
|
05/30/2019 | CONSULTATION | Wyatt T. Haygood | APPROVED | PERMIT IS ABOUT TO EXPIRE | 5/29/2019 10:55:10 AM
VB
|
|
| INSULATION | Wyatt T. Haygood | | | |
|
| DRYWALL SCREW | Wyatt T. Haygood | | | |
|
| BALCONY RAIL/GRILLE | Wyatt T. Haygood | | | |
|
| DRIVEWAY STEEL/PAVER | Wyatt T. Haygood | | | |
|
| PATIO SLAB/PAVERS | Wyatt T. Haygood | | | |
|
09/28/2020 | ELECTRIC ROUGH | David Hayes | PARTIAL APPROVAL | PARTIAL FOR REAR PATIO | 9/28/2020 8:11:17 AM
PARTIAL FOR REAR PATIO
9/28/2020 2:40:52 PM
Soffits only. Front portachere. and rear patios.
|
|
10/01/2020 | WIND/DOOR ATTACHMENT | Will Jorge | DISAPPROVED | | 9/30/2020 4:12:39 PM
VB
10/1/2020 2:45:39 PM
no NOAs on site, front door frame out requires engineer detail for pad out...everything else ok
|
|
| WIND/DOOR ATTACHMENT | Wyatt T. Haygood | | | |
|
10/02/2020 | TRUSS | Will Jorge | DISAPPROVED | | 10/1/2020 12:36:20 PM
ST
10/2/2020 3:31:23 PM
no approved plans on site, work not ready, note; flat roof leaking water at point it is ponding against the house. 1/4" minimum positive pitch away from house required, need to correct situation
|
|
10/07/2020 | UNIT MASONRY CERT | Wyatt T. Haygood | APPROVED | | 6/11/2018 3:33:49 PM
Need spot survey submitted and approved. Also need tie beam inspection done after spot survey approval prior to unit masonry sign-off per Bill Tracy.
9/13/2018 8:37:51 AM
9-13-18 First Floor Inspection Report inserted into city file.
|
|
10/27/2020 | WIRE LATH | Will Jorge | PARTIAL APPROVAL | | 10/27/2020 3:07:49 PM
miscellaneous soffits not completed and front entry cover not done.
|
|
01/27/2021 | ROOF TILE UPLIFT TST | Wyatt T. Haygood | APPROVED | | |
|
02/23/2021 | ELECTRIC ROUGH | Dean DiBisceglie | APPROVED | | 2/22/2021 10:34:20 AM
VB
|
|
03/03/2021 | ROUGH DUCT | Dave Chin-Sang | DISAPPROVED | | 3/2/2021 1:37:52 PM
VB
3/3/2021 12:04:53 PM
New construction house. Lock up no entry . Tagged door 10:40am
|
|
03/04/2021 | ROUGH DUCT | Dave Chin-Sang | DISAPPROVED | | 3/4/2021 12:19:28 PM
Ductwork not to plan, too many changes to wait for COP @ final
|
|
03/17/2021 | SECOND ROUGH | Jeremy Hassenplug | DISAPPROVED | | 3/16/2021 2:17:23 PM
JS
3/17/2021 1:55:50 PM
2nd upstairs bathroom not on plans.
Shower in 2nd upstairs bathroom to small. FBCR P2708
Truss under 2nd upstairs bathroom was cut below shower to allow for p-trap. FBCR P2603.2
2nd bathroom toilet space is too small. Minimum 30" and 15" to center of toilet FBCR P2705.5
Sanitary not draining.
Downstairs bathroom tub changed to shower.
1st upstairs bathroom tub changed to shower
C.O.P. Needed
|
|
05/18/2021 | ROOF FINAL | Will Jorge | DISAPPROVED | | 5/17/2021 4:17:51 PM
ST
5/18/2021 3:28:45 PM
no ladder
|
|
05/19/2021 | ROOF FINAL | Tony Willson | DISAPPROVED | | 5/18/2021 3:30:46 PM
vb
5/19/2021 12:53:52 PM
1) Open plumbing stack on rear flat roof.
2) Flat roof appears to be back pitched towards the house. Many areas have ponding water.
FBC 110.9.1
|
|
05/24/2021 | WIRE LATH | Wyatt T. Haygood | APPROVED | | |
|
| LOW VOLTAGE FINAL | David Hayes | | TV,PHONE,WIFI | |
|
05/27/2021 | LOW VOLTAGE ROUGH | David Hayes | APPROVED | TV,PHONE,WIFI | 5/26/2021 2:29:05 PM
th
|
|
06/16/2021 | ROUGH DUCT | Dave Chin-Sang | CANCELLED BY DEPT | | 6/15/2021 3:43:58 PM
th
6/16/2021 11:58:34 AM
COP required b4 rough .
|
|
06/16/2021 | EXHAUST ROUGH | Dave Chin-Sang | CANCELLED BY DEPT | | 6/15/2021 3:43:28 PM
th
6/16/2021 11:58:37 AM
COP required
|
|
| EXHAUST ROUGH | Scott Wiesel | | | |
|
09/30/2021 | ROOF FINAL | Will Jorge | DISAPPROVED | | 9/30/2021 3:20:47 PM
property overgrown with vegetation
need ladder set up for upper roof
|
|
| SECOND ROUGH | Jan Trana | | UPDATE PLBD INSURANCE | |
|
| ROUGH DUCT | Scott Wiesel | | UPDATE MECH INSURANCE | |
|
| SHOWER PAN | Jan Trana | | UPDATE PLBD INSURANCE | |
|
| TOP OUT | Jan Trana | | UPDATE PLBD INSURANCE | |
|
| TRUSS | Wyatt T. Haygood | | UPDATED INSURANCE | |
|
| TUB ROUGH-IN | Jan Trana | | UPDATED INSURANCE | |
|
10/14/2021 | ROOF FINAL | Will Jorge | APPROVED | | 10/13/2021 4:29:42 PM
ST
|
|