  Date of Inspection Inspection Type Inspector Result Remarks Notes

 07/30/20182ND FLOOR SLAB STRWill JorgeAPPROVED7/27/2018 3:10:54 PM la

 01/30/2019HOT MOP IN PROGRESSWill JorgeDISAPPROVED1/29/2019 1:16:04 PM vb 1/30/2019 2:45:37 PM Remove 30# and peel and stick, need to pass roof shtg. Prior to concealing

 08/09/2019ROOF FINALWill JorgeDISAPPROVED8/8/2019 4:54:36 PM JD 8/9/2019 2:39:17 PM No ladder no access to house due to grade and rain

 08/02/2019ROOF TILE UPLIFT TSTWyatt T. HaygoodAPPROVED8/1/2019 1:51:44 PM ROOF TILE UPLIFT

 03/25/2019TILE IN PROGRESSWyatt T. HaygoodDISAPPROVED3/25/2019 4:36:09 PM Roof permit required for inspection.

 09/07/20182ND FL TIE BEAM/BONDWill JorgeAPPROVED7/27/2018 3:11:50 PM la 9/6/2018 12:06:39 PM la

 02/08/2018FOOTER/FOUNDATIONWill JorgePARTIAL APPROVAL2/8/2018 4:39:21 PM See plan for areas hilited approved

WIND/DOOR ATTACHMENTWyatt T. HaygoodFront door2/6/2020 3:58:06 PM Front Door

WIND/DOOR ATTACHMENTWyatt T. Haygood

 02/11/2019HOT MOP IN PROGRESSWill JorgeCANCELLED BY PERMITE2/8/2019 11:19:43 AM VB 2/11/2019 1:29:46 PM Not enough work

 11/06/2018TRUSSWill JorgeAPPROVED11/6/2018 12:54:22 PM Engineers letters to file

 04/01/2019TILE IN PROGRESSWyatt T. HaygoodDISAPPROVED3/29/2019 3:44:38 PM AT 4/1/2019 12:23:20 PM Roof tile not same type as per plan. Moment based calculations are based on incorrect roof tile NOA and incorrect roof slope. This home is a 6/12 pitch. Change of plan required.

 05/21/2019TILE IN PROGRESSWill JorgeAPPROVED5/16/2019 11:59:25 AM VB 5/17/2019 3:44:04 PM no additional progress since previous red tag 5-17-19

 03/01/2019HOT MOP IN PROGRESSWill JorgeAPPROVED2/28/2019 3:21:49 PM AT

 02/28/2019HOT MOP IN PROGRESSWill JorgeDISAPPROVED2/27/2019 2:11:03 PM AT 2/28/2019 1:47:55 PM No ladder

 05/10/2019WIND/DOOR BUCKWill JorgeAPPROVED5/10/2019 3:17:59 PM Less front door

 05/08/2019WIRE LATHWill JorgeAPPROVED

 08/15/2019ROOF FINALWill JorgeAPPROVED8/14/2019 10:11:46 AM ST

TEMP POLEDavid Hayes

 07/19/2018TIE BEAM/BONDWill JorgeDISAPPROVEDREQ 2ND FL TIE7/18/2018 10:16:22 AM AT 7/19/2018 2:18:30 PM Same as previous

 07/30/2018TIE BEAM/BONDWill JorgeAPPROVED

 02/07/2018SERVICE GROUNDDean DiBisceglieAPPROVED

 03/13/2018FOOTER/FOUNDATIONWill JorgeCANCELLED BY PERMITE3/13/2018 1:09:58 PM Work not ready

 03/15/2018FOOTER/FOUNDATIONWill JorgeAPPROVED

30 DAY FOR TESTINGDavid Hayes

 03/06/2018CONDENSATE LINERowdy GiffordAPPROVED

DW SUBGRADE DENSITYPerry Taborn

TEMP ON HOUSEDavid Hayes

 12/28/2017NOCLaurie AndersonAPPROVED

 03/06/2018GROUND ROUGHRowdy GiffordAPPROVED3/6/2018 9:07:40 AM Will require ground rough as built by final

 02/05/2018SERVICE GROUNDJoe NievesDISAPPROVED2/5/2018 10:46:56 AM Approved Plan Required For Inspection. Service Ground Not Installed. FBC 107.3.1 FBC 110.9.1

 03/15/2018SLAB ELECTRICJoe NievesAPPROVED

 02/06/2018SOIL BEARING CERTWyatt T. HaygoodAPPROVED

 02/06/2018TRUSS PLANS ON FILEDebbie GrosseAPPROVEDSUBMITTED ONLY

 03/13/2018SOIL TERMITE TREATBill TracyAPPROVED3/13/2018 1:57:32 PM .01% Imidicloprid - 3000 sf With compaction report and concrete compressin test results

 03/21/2018SLABWill JorgeAPPROVED

 04/26/2017PRODUCT APPROVALSC.A.P. Gov STAPPROVED

 06/13/2018SPOT SURVEYBill TracyAPPROVED

 06/13/2018TIE BEAM/BONDWill JorgeDISAPPROVED6/13/2018 3:11:29 PM Columns supporting beam/hambro system not installed steel burning in beams, dirty down cells inspection stopped

 04/30/2019ELECTRIC ROUGHDean DiBiscegliePARTIAL APPROVALrequest partial for exterior

 01/31/2019ROOF SHEATHINGBill TracyAPPROVED1/31/2019 10:56:33 AM ENGINEERING LETTER BOUGHT IN. OK TO APPROVE PER BILL.LETTER PLACED IN FOLDER

TELEPHONE ROUGHDavid Hayes

 11/01/2018TRUSSWill JorgeDISAPPROVED10/31/2018 8:29:36 AM AT 11/1/2018 3:51:57 PM No safety rails

TV ROUGHDavid Hayes

 04/26/2019UNIT MASONRY CERTWyatt T. HaygoodAPPROVED

 04/30/2019WIND/DOOR BUCKWill JorgeNOT READY4/30/2019 12:42:20 PM Some openings storefront, some 2x bucks installed, with SGD installed concealed attachments, inspection stopped

 02/01/2019TIN CAPWill JorgeAPPROVED

 02/06/2020WIND/DOOR ATTACHMENTWyatt T. HaygoodPARTIAL APPROVAL2/6/2020 4:00:18 PM all except front door not installed and Jeld wen Door Frames not attached as per Product Approval.

 04/30/2019WIRE LATHWill JorgeDISAPPROVED4/29/2019 4:24:18 PM wth 4/30/2019 12:42:20 PM Wire lath not ready for inspection, many areas incomplete

ELECTRIC FINALDavid Hayes

FINAL SURVEYZONE

TELEPHONE FINALDavid Hayes

TV FINALDavid Hayes

ZONING INSPECTIONJean Panebianco

BALCONY RAIL/GRILLEMichael Guerasio

ENG DRAINAGEPerry Taborn

DATA FINALDavid Hayes

DATA ROUGHDavid Hayes

 10/14/2020CAN/LAKE/SWALE/SLOPEPerry TabornDISAPPROVED

CAN/LAKE/SWALE/SLOPEPerry Taborn

LANDSCAPINGPatti Hoot

FRAMINGWyatt T. Haygood

INSULATIONWyatt T. Haygood

DRYWALL SCREWWyatt T. Haygood

TILE IN PROGRESSWyatt T. Haygood

DRIVEWAY STEEL/PAVERWyatt T. Haygood

FINAL GAS-PLUMBINGJan Trana

IRRIGATION FINALJan Trana

PATIO SLAB/PAVERSWyatt T. Haygood

PLUMBING FINALJan Trana

ROOF FINALWyatt T. Haygood

SEWER FINALJan Trana

ADMIN POOL COMPLETEVictoria Barrios

ADMIN CHECKLIST**Victoria Barrios

FINALWyatt T. Haygood

TUB ROUGH-INJan Trana

TOP OUTJan Trana

SHOWER PANJan Trana

SECOND ROUGHJan Trana

GAS LINE RGH IN-PLJan Trana

UNDERGROUNDJoe Nieves

 06/07/2023SLABWill JorgeDISAPPROVEDslab repair6/6/2023 4:27:20 PM vb 6/7/2023 4:02:40 PM house locked 3:10 will resch, for am

 06/08/2023SLABWill JorgeDISAPPROVED6/8/2023 3:51:47 PM 8:30 house locked no one on site, no access

 06/09/2023SLABWill JorgeAPPROVEDrepairs

 06/13/2023SOIL TERMITE TREATWyatt T. HaygoodAPPROVEDslab repairs

 12/05/2023ROUGH DUCTDave Chin-SangDISAPPROVED12/1/2023 1:43:09 PM MT-OK TO SCHEDULE PER BILL 12/5/2023 10:48:13 AM No access @ 10:46am tagged

ROUGH DUCTDave Chin-Sang

 12/05/2023ELECTRIC ROUGHJoe NievesPARTIAL APPROVAL12/1/2023 1:43:53 PM MT-OK TO SCHEDULE PER BILL 12/5/2023 2:54:38 PM PARTIAL ELECTRIC ROUGH APPROVED FOR ABOVE CEILING WORK. OK TO SPRAY ICEING

ELECTRIC ROUGHJoe Nieves

BLOWER DOOR TESTDave Chin-Sang3/1/2024 5:43:40 AM ACH 6.0 max

WATER SERVICEJan Trana

IRRIGATION ROUGHJan Trana

 06/06/2023UNDERGROUNDPedro VieiraDISAPPROVED6/5/2023 1:45:01 PM VB 6/6/2023 6:53:22 AM Inspector EL18 changed the inspection assignment from EL18 to EL16 6/6/2023 10:18:44 AM No access 10:20am 6/6/2023 10:34:46 AM No access 10:20am

 05/12/2023GROUND ROUGHJeremy HassenplugDISAPPROVEDREVISION5/12/2023 11:28:19 AM No test on sanitary WORK NOT TO PLAN

GAS LINE RGH OUT-PLJan Trana

LP TANK ROUGH-PLUMJan Trana

 06/06/2023GROUND ROUGHJeremy HassenplugPARTIAL APPROVAL6/5/2023 1:44:05 PM VB 6/6/2023 11:04:31 AM Pending change of plans

GROUND ROUGHJan Trana

SEWER CONNECTIONJan Trana

MECHANICAL FINALDave Chin-Sang

EXHAUST ROUGHDave Chin-Sang