07/30/2018 | 2ND FLOOR SLAB STR | Will Jorge | APPROVED | | 7/27/2018 3:10:54 PM
la
|
|
01/30/2019 | HOT MOP IN PROGRESS | Will Jorge | DISAPPROVED | | 1/29/2019 1:16:04 PM
vb
1/30/2019 2:45:37 PM
Remove 30# and peel and stick, need to pass roof shtg. Prior to concealing
|
|
08/09/2019 | ROOF FINAL | Will Jorge | DISAPPROVED | | 8/8/2019 4:54:36 PM
JD
8/9/2019 2:39:17 PM
No ladder no access to house due to grade and rain
|
|
08/02/2019 | ROOF TILE UPLIFT TST | Wyatt T. Haygood | APPROVED | | 8/1/2019 1:51:44 PM
ROOF TILE UPLIFT
|
|
03/25/2019 | TILE IN PROGRESS | Wyatt T. Haygood | DISAPPROVED | | 3/25/2019 4:36:09 PM
Roof permit required for inspection.
|
|
09/07/2018 | 2ND FL TIE BEAM/BOND | Will Jorge | APPROVED | | 7/27/2018 3:11:50 PM
la
9/6/2018 12:06:39 PM
la
|
|
02/08/2018 | FOOTER/FOUNDATION | Will Jorge | PARTIAL APPROVAL | | 2/8/2018 4:39:21 PM
See plan for areas hilited approved
|
|
| WIND/DOOR ATTACHMENT | Wyatt T. Haygood | | Front door | 2/6/2020 3:58:06 PM
Front Door
|
|
| WIND/DOOR ATTACHMENT | Wyatt T. Haygood | | | |
|
02/11/2019 | HOT MOP IN PROGRESS | Will Jorge | CANCELLED BY PERMITE | | 2/8/2019 11:19:43 AM
VB
2/11/2019 1:29:46 PM
Not enough work
|
|
11/06/2018 | TRUSS | Will Jorge | APPROVED | | 11/6/2018 12:54:22 PM
Engineers letters to file
|
|
04/01/2019 | TILE IN PROGRESS | Wyatt T. Haygood | DISAPPROVED | | 3/29/2019 3:44:38 PM
AT
4/1/2019 12:23:20 PM
Roof tile not same type as per plan.
Moment based calculations are based on incorrect roof tile NOA and incorrect roof slope.
This home is a 6/12 pitch.
Change of plan required.
|
|
05/21/2019 | TILE IN PROGRESS | Will Jorge | APPROVED | | 5/16/2019 11:59:25 AM
VB
5/17/2019 3:44:04 PM
no additional progress since previous red tag 5-17-19
|
|
03/01/2019 | HOT MOP IN PROGRESS | Will Jorge | APPROVED | | 2/28/2019 3:21:49 PM
AT
|
|
02/28/2019 | HOT MOP IN PROGRESS | Will Jorge | DISAPPROVED | | 2/27/2019 2:11:03 PM
AT
2/28/2019 1:47:55 PM
No ladder
|
|
05/10/2019 | WIND/DOOR BUCK | Will Jorge | APPROVED | | 5/10/2019 3:17:59 PM
Less front door
|
|
05/08/2019 | WIRE LATH | Will Jorge | APPROVED | | |
|
08/15/2019 | ROOF FINAL | Will Jorge | APPROVED | | 8/14/2019 10:11:46 AM
ST
|
|
| TEMP POLE | David Hayes | | | |
|
07/19/2018 | TIE BEAM/BOND | Will Jorge | DISAPPROVED | REQ 2ND FL TIE | 7/18/2018 10:16:22 AM
AT
7/19/2018 2:18:30 PM
Same as previous
|
|
07/30/2018 | TIE BEAM/BOND | Will Jorge | APPROVED | | |
|
02/07/2018 | SERVICE GROUND | Dean DiBisceglie | APPROVED | | |
|
03/13/2018 | FOOTER/FOUNDATION | Will Jorge | CANCELLED BY PERMITE | | 3/13/2018 1:09:58 PM
Work not ready
|
|
03/15/2018 | FOOTER/FOUNDATION | Will Jorge | APPROVED | | |
|
| 30 DAY FOR TESTING | David Hayes | | | |
|
03/06/2018 | CONDENSATE LINE | Rowdy Gifford | APPROVED | | |
|
| DW SUBGRADE DENSITY | Perry Taborn | | | |
|
| TEMP ON HOUSE | David Hayes | | | |
|
12/28/2017 | NOC | Laurie Anderson | APPROVED | | |
|
03/06/2018 | GROUND ROUGH | Rowdy Gifford | APPROVED | | 3/6/2018 9:07:40 AM
Will require ground rough as built by final
|
|
02/05/2018 | SERVICE GROUND | Joe Nieves | DISAPPROVED | | 2/5/2018 10:46:56 AM
Approved Plan Required For Inspection. Service Ground Not Installed.
FBC 107.3.1
FBC 110.9.1
|
|
03/15/2018 | SLAB ELECTRIC | Joe Nieves | APPROVED | | |
|
02/06/2018 | SOIL BEARING CERT | Wyatt T. Haygood | APPROVED | | |
|
02/06/2018 | TRUSS PLANS ON FILE | Debbie Grosse | APPROVED | SUBMITTED ONLY | |
|
03/13/2018 | SOIL TERMITE TREAT | Bill Tracy | APPROVED | | 3/13/2018 1:57:32 PM
.01% Imidicloprid - 3000 sf
With compaction report and concrete compressin test results
|
|
03/21/2018 | SLAB | Will Jorge | APPROVED | | |
|
04/26/2017 | PRODUCT APPROVALS | C.A.P. Gov ST | APPROVED | | |
|
06/13/2018 | SPOT SURVEY | Bill Tracy | APPROVED | | |
|
06/13/2018 | TIE BEAM/BOND | Will Jorge | DISAPPROVED | | 6/13/2018 3:11:29 PM
Columns supporting beam/hambro system not installed steel burning in beams, dirty down cells inspection stopped
|
|
04/30/2019 | ELECTRIC ROUGH | Dean DiBisceglie | PARTIAL APPROVAL | request partial for exterior | |
|
01/31/2019 | ROOF SHEATHING | Bill Tracy | APPROVED | | 1/31/2019 10:56:33 AM
ENGINEERING LETTER BOUGHT IN. OK TO APPROVE PER BILL.LETTER PLACED IN FOLDER
|
|
| TELEPHONE ROUGH | David Hayes | | | |
|
11/01/2018 | TRUSS | Will Jorge | DISAPPROVED | | 10/31/2018 8:29:36 AM
AT
11/1/2018 3:51:57 PM
No safety rails
|
|
| TV ROUGH | David Hayes | | | |
|
04/26/2019 | UNIT MASONRY CERT | Wyatt T. Haygood | APPROVED | | |
|
04/30/2019 | WIND/DOOR BUCK | Will Jorge | NOT READY | | 4/30/2019 12:42:20 PM
Some openings storefront, some 2x bucks installed, with SGD installed concealed attachments, inspection stopped
|
|
02/01/2019 | TIN CAP | Will Jorge | APPROVED | | |
|
02/06/2020 | WIND/DOOR ATTACHMENT | Wyatt T. Haygood | PARTIAL APPROVAL | | 2/6/2020 4:00:18 PM
all except front door not installed and
Jeld wen Door Frames not attached as per Product Approval.
|
|
04/30/2019 | WIRE LATH | Will Jorge | DISAPPROVED | | 4/29/2019 4:24:18 PM
wth
4/30/2019 12:42:20 PM
Wire lath not ready for inspection, many areas incomplete
|
|
| ELECTRIC FINAL | David Hayes | | | |
|
| FINAL SURVEY | ZONE | | | |
|
| TELEPHONE FINAL | David Hayes | | | |
|
| TV FINAL | David Hayes | | | |
|
| ZONING INSPECTION | Jean Panebianco | | | |
|
| BALCONY RAIL/GRILLE | Michael Guerasio | | | |
|
| ENG DRAINAGE | Perry Taborn | | | |
|
| DATA FINAL | David Hayes | | | |
|
| DATA ROUGH | David Hayes | | | |
|
10/14/2020 | CAN/LAKE/SWALE/SLOPE | Perry Taborn | DISAPPROVED | | |
|
| CAN/LAKE/SWALE/SLOPE | Perry Taborn | | | |
|
| LANDSCAPING | Patti Hoot | | | |
|
| FRAMING | Wyatt T. Haygood | | | |
|
| INSULATION | Wyatt T. Haygood | | | |
|
| DRYWALL SCREW | Wyatt T. Haygood | | | |
|
| TILE IN PROGRESS | Wyatt T. Haygood | | | |
|
| DRIVEWAY STEEL/PAVER | Wyatt T. Haygood | | | |
|
| FINAL GAS-PLUMBING | Jan Trana | | | |
|
| IRRIGATION FINAL | Jan Trana | | | |
|
| PATIO SLAB/PAVERS | Wyatt T. Haygood | | | |
|
| PLUMBING FINAL | Jan Trana | | | |
|
| ROOF FINAL | Wyatt T. Haygood | | | |
|
| SEWER FINAL | Jan Trana | | | |
|
| ADMIN POOL COMPLETE | Victoria Barrios | | | |
|
| ADMIN CHECKLIST** | Victoria Barrios | | | |
|
| FINAL | Wyatt T. Haygood | | | |
|
| TUB ROUGH-IN | Jan Trana | | | |
|
| TOP OUT | Jan Trana | | | |
|
| SHOWER PAN | Jan Trana | | | |
|
| SECOND ROUGH | Jan Trana | | | |
|
| GAS LINE RGH IN-PL | Jan Trana | | | |
|
| UNDERGROUND | Joe Nieves | | | |
|
06/07/2023 | SLAB | Will Jorge | DISAPPROVED | slab repair | 6/6/2023 4:27:20 PM
vb
6/7/2023 4:02:40 PM
house locked 3:10 will resch, for am
|
|
06/08/2023 | SLAB | Will Jorge | DISAPPROVED | | 6/8/2023 3:51:47 PM
8:30 house locked no one on site, no access
|
|
06/09/2023 | SLAB | Will Jorge | APPROVED | repairs | |
|
06/13/2023 | SOIL TERMITE TREAT | Wyatt T. Haygood | APPROVED | slab repairs | |
|
12/05/2023 | ROUGH DUCT | Dave Chin-Sang | DISAPPROVED | | 12/1/2023 1:43:09 PM
MT-OK TO SCHEDULE PER BILL
12/5/2023 10:48:13 AM
No access @ 10:46am tagged
|
|
| ROUGH DUCT | Dave Chin-Sang | | | |
|
12/05/2023 | ELECTRIC ROUGH | Joe Nieves | PARTIAL APPROVAL | | 12/1/2023 1:43:53 PM
MT-OK TO SCHEDULE PER BILL
12/5/2023 2:54:38 PM
PARTIAL ELECTRIC ROUGH APPROVED FOR ABOVE CEILING WORK.
OK TO SPRAY ICEING
|
|
| ELECTRIC ROUGH | Joe Nieves | | | |
|
| BLOWER DOOR TEST | Dave Chin-Sang | | | 3/1/2024 5:43:40 AM
ACH 6.0 max
|
|
| WATER SERVICE | Jan Trana | | | |
|
| IRRIGATION ROUGH | Jan Trana | | | |
|
06/06/2023 | UNDERGROUND | Pedro Vieira | DISAPPROVED | | 6/5/2023 1:45:01 PM
VB
6/6/2023 6:53:22 AM
Inspector EL18 changed the inspection assignment from EL18 to EL16
6/6/2023 10:18:44 AM
No access 10:20am
6/6/2023 10:34:46 AM
No access 10:20am
|
|
05/12/2023 | GROUND ROUGH | Jeremy Hassenplug | DISAPPROVED | REVISION | 5/12/2023 11:28:19 AM
No test on sanitary
WORK NOT TO PLAN
|
|
| GAS LINE RGH OUT-PL | Jan Trana | | | |
|
| LP TANK ROUGH-PLUM | Jan Trana | | | |
|
06/06/2023 | GROUND ROUGH | Jeremy Hassenplug | PARTIAL APPROVAL | | 6/5/2023 1:44:05 PM
VB
6/6/2023 11:04:31 AM
Pending change of plans
|
|
| GROUND ROUGH | Jan Trana | | | |
|
| SEWER CONNECTION | Jan Trana | | | |
|
| MECHANICAL FINAL | Dave Chin-Sang | | | |
|
| EXHAUST ROUGH | Dave Chin-Sang | | | |
|