  Date of Inspection Inspection Type Inspector Result Remarks Notes

 01/16/2020UNDERGROUNDDean DiBisceglieAPPROVED1/15/2020 3:06:45 PM Scheduled for 1/16/2020 under PrePermit Agreement 1/16/2020 5:23:50 PM Approved by Dean 1/16/2020 Additional Underground approved for temp service

 08/25/2020TEMP POLEDean DiBisceglieAPPROVED8/21/2020 3:24:51 PM VB

 06/02/2020ROOF SHEATHINGTony WillsonPARTIAL APPROVAL6/1/2020 4:08:52 PM vb 6/2/2020 3:14:33 PM 1) R.C. fascia was installed on the entire low roof areas. Cedar is not considered a structural framing member and is not code compliant without a structural 2x sub-fascia. 2) The builders representative and the shell contractor was made aware that this partial roof sheathing is giving them an approval to dry-in the lower roof/plywood so the rain doesn't start to delaminate the roof sheathing. 3) The previous roof sheathing inspection was disapproved because of the cedar fascia used. It was suggested that in lieu of removing the cedar fascia it would be acceptable to block between all truss tails with a 2x S.Y.P blocking. Then nail the ends of the blocking to the truss tails and nail the plywood sheathing @ 4" oc into the blocking around the entire perimeter.

 06/11/2020ROOF SHEATHINGTony WillsonAPPROVED6/10/2020 1:16:06 PM ST 6/11/2020 1:43:34 PM 1) Upper and lower roofs approved.

 08/07/2020HOT MOP IN PROGRESSWill JorgeAPPROVED8/6/2020 9:58:18 AM JS

 08/25/2020WIND/DOOR BUCKWill JorgeAPPROVED8/21/2020 3:24:24 PM VB

 08/07/2020TRUSSWill JorgeDISAPPROVED8/6/2020 9:58:53 AM JS 8/7/2020 2:54:57 PM need engineers inspection certification letter for trusses , repairs and modifications

 07/22/2020TRUSSTony WillsonDISAPPROVED7/21/2020 10:20:09 AM VB 7/22/2020 2:37:58 PM 1) There are 2 conditions that need to addressed by the E.O.R./P.E. a-Attachment detail for the framed dormers. b-Letter addressing the missed tie-beam above the nook area @ the front garage.

 05/13/2020NOCDebbie GrosseAPPROVED12/13/2019 9:59:59 AM NOC RECORDED 12/12/2019 WITH EXPIRATION OF 12/12/2020 PPCA ISSUED UNDER THIS NOC RECORDED

 01/13/2020GROUND ROUGHRowdy GiffordAPPROVED

 01/09/2020NPDES INITIALPerry TabornAPPROVED1/8/2020 12:30:00 PM SCHED FOR 1/8/2020 1/10/2020 9:38:44 AM INSPECTION APPROVED BY PERRY TABORN 1/9/2020

 01/29/2020SERVICE GROUNDDean DiBisceglieAPPROVED1/29/2020 2:28:48 PM Scheduled for 1/29/2020. Approved by Dean on 1/29/2020

 01/29/2020SLAB ELECTRICDean DiBisceglieAPPROVED1/29/2020 2:29:46 PM Scheduled for 1/29/2020. Approved by Dean on 1/29/2020

 02/25/2020SOIL BEARING CERTWyatt T. HaygoodAPPROVED2/25/2020 3:40:05 PM Soil Bearing Certificate submitted 2-25-20

 02/25/2020SOIL TERMITE TREATWyatt T. HaygoodAPPROVED2/25/2020 3:38:50 PM Soil Termite Treatment Certificate submitted and approved 2-25-2020

 02/26/2020TRUSS PLANS ON FILEBill TracyAPPROVED

 03/03/2020SLABWyatt T. HaygoodAPPROVED2/28/2020 1:36:32 PM INSPECTION SCHEDULED FOR 3/3/2020 3/6/2020 1:17:09 PM Slab inspection approved on 3-3-2020

 06/09/2020PRODUCT APPROVALSDebbie GrosseAPPROVEDSUBMITTED ONLY

 04/27/2020SPOT SURVEYWyatt T. HaygoodAPPROVED4/16/2020 3:19:30 PM SPOT SURVEY NEEDS TO BE SUBMITTED SURVEY SUBMITTED WAS A FINAL SURVEY REFLECTING FINISHED HOUSE W/ POOL. 4/27/2020 6:33:19 PM Spot Survey approved

 05/29/2020ROOF SHEATHINGTony WillsonDISAPPROVED5/29/2020 2:59:20 PM 1) RC is not a structural lumber. In order to use this species of lumber there must be a 2x structural sub-fascia. FBC (110.9.1)

 06/24/2020TRUSSTony WillsonPARTIAL APPROVAL6/24/2020 12:29:17 PM 1) An engineers detail letter is required for the small tie-beam that was missed in the garage. 17/S6 shows a truss hanger for one truss attached to concrete. There was no beam constructed. There was a 2 ply header constructed instead of a concrete beam. Need this and 2 connections clarified. 2) The dormer framing anchors at the bottom of the 2x6 framing doesn't match what was built. Need the engineer to address these locations.

 06/24/2020WALL SHEATHINGTony WillsonAPPROVED

 08/17/2020WIND/DOOR BUCKTony WillsonPARTIAL APPROVAL8/14/2020 8:45:23 AM JS 8/17/2020 10:58:13 AM 1) All of the door bucks were incomplete. FBC 110.9.1 2) Window bucks were approved. Re-schedule once the door bucks are completed.

 07/22/2020TIN CAPTony WillsonAPPROVED7/21/2020 10:14:55 AM VB

 07/28/2020HOT MOP IN PROGRESSTony WillsonDISAPPROVED7/27/2020 3:44:47 PM VB 7/28/2020 12:21:50 PM 1) Job incomplete. Re-schedule this inspection when the cap sheet is 100% before any roof tile is loaded. FBC 110.9.1

 05/26/20202ND FL TIE BEAM/BONDTony WillsonAPPROVED5/22/2020 2:50:38 PM ST

 10/02/2020ELECTRIC ROUGHDavid HayesCANCELLED BY PERMITE10/1/2020 12:47:16 PM VB

 10/02/2020WIRE LATHWill JorgeCANCELLED BY PERMITE10/1/2020 12:48:31 PM VB

 10/02/2020EXHAUST ROUGHDave Chin-SangDISAPPROVED10/1/2020 12:47:37 PM VB 10/2/2020 11:50:28 AM Missing BXF in master bathroom

 10/02/2020SECOND ROUGHJan TranaDISAPPROVED10/1/2020 12:48:05 PM VB 10/2/2020 2:29:35 PM Not ready 10/2/2020 2:36:10 PM Not ready 10/2/2020 2:37:33 PM Not ready 10/2/2020 2:38:58 PM Not ready 10/2/2020 2:42:37 PM Not ready

 10/02/2020GAS LINE RGH IN-PLJan TranaDISAPPROVED10/1/2020 2:40:54 PM JS 10/2/2020 2:29:39 PM Not ready 10/2/2020 2:36:13 PM Not ready 10/2/2020 2:37:37 PM Not ready 10/2/2020 2:39:02 PM Not ready 10/2/2020 2:42:41 PM Not ready

 10/16/2020TUB ROUGH-INJan TranaCANCELLED BY DEPT10/15/2020 2:10:59 PM JS

 10/16/2020SECOND ROUGHJan TranaAPPROVED

 10/16/2020TOP OUTJan TranaAPPROVEDSEE NOTES1/23/2020 12:06:25 PM This property may by connected to a sanitary sewer line extension Either provide proof of application for sewer extension or Broward County approval for a septic tank prior to top out inspection 10/16/2020 1:46:13 PM Need COP by final

 10/20/2020TUB ROUGH-INJan TranaPARTIAL APPROVAL10/20/2020 2:03:39 PM First floor guest bathroom only.

 10/23/2020GAS LINE RGH IN-PLJan TranaDISAPPROVED10/21/2020 12:00:40 PM JS 10/23/2020 1:50:43 PM Need COP

 11/06/2020PLUMBING MISCJan TranaAPPROVEDCap off11/5/2020 11:22:16 AM la 11/5/2020 4:53:24 PM ST 11/6/2020 2:44:54 PM Eliminate gathering room bathroom COP required by final

 11/10/2020ELECTRIC ROUGHDean DiBiscegliePARTIAL APPROVALall but garage area11/5/2020 11:20:25 AM la 11/5/2020 4:47:41 PM VAL

 11/10/2020WIRE LATHWill JorgeAPPROVED

 11/12/2020GAS LINE RGH OUT-PLDave Chin-SangCANCELLED BY PERMITE11/10/2020 4:21:15 PM VB 11/12/2020 8:43:18 AM Valerie

 11/12/2020LOW VOLTAGE ROUGHJoe NievesCANCELLED BY PERMITETV,PHONE,ALARM,SPKS,VAC11/10/2020 4:20:31 PM VB

 11/12/2020ELECTRIC ROUGHJoe NievesCANCELLED BY PERMITE11/10/2020 4:20:50 PM VB

 11/12/2020ELECTRIC ROUGHJoe NievesCANCELLED BY PERMITE11/5/2020 4:49:37 PM ST

 11/12/2020ROUGH DUCTDave Chin-SangAPPROVED11/10/2020 4:21:58 PM VB

 11/13/2020EXHAUST ROUGHDave Chin-SangAPPROVED

 11/13/2020FRAMINGWill JorgePARTIAL APPROVAL11/12/2020 3:59:58 PM VB 11/13/2020 1:23:18 PM second floor only 11/13/2020 1:23:18 PM second floor only

 11/13/2020LOW VOLTAGE ROUGHDavid HayesPARTIAL APPROVAL11/12/2020 2:06:39 PM JS 11/13/2020 2:52:28 PM Needs strapping. Support and protection. 110.9.1

 11/20/2020TUB ROUGH-INJan TranaAPPROVED11/19/2020 4:02:56 PM VB

 11/20/2020SHOWER PANJan TranaAPPROVED11/19/2020 4:02:38 PM VB

 11/23/2020FRAMINGTony WillsonDISAPPROVED11/20/2020 3:13:03 PM ST 11/23/2020 12:38:15 PM 1) First floor not complete. Foam and add draft stops throughout. Garages were not ready. FBC 110.9.1 11/23/2020 12:39:00 PM 1) First floor not complete. Foam and add draft stops throughout. Garages were not ready. FBC 110.9.1

 11/24/2020FRAMINGTony WillsonPARTIAL APPROVAL11/24/2020 1:32:09 PM 1) The garages have not been inspected for framing. **Only the first and second floors in the main building were approved.

 12/01/2020GAS LINE RGH OUT-PLJan TranaDISAPPROVED11/30/2020 4:49:59 PM VB 12/1/2020 12:26:55 PM Not ready 12/1/2020 12:27:21 PM Not ready 12/1/2020 12:27:44 PM Not ready 12/1/2020 12:57:49 PM Not ready

 12/01/2020GAS LINE RGH IN-PLJan TranaAPPROVED11/30/2020 4:51:12 PM VB

 12/01/2020INSULATIONWill JorgeAPPROVED11/30/2020 4:51:38 PM VB 12/1/2020 2:20:21 PM spray foam attic 12/1/2020 2:20:22 PM spray foam attic

 04/28/2020TIE BEAM/BONDBill TracyAPPROVEDPPCA ISSUED/SEE NOTES12/13/2019 10:01:57 AM PPCA ISSUED UNDER CONDITION THAT CONTRACTOR ONLY WORK UNTIL 1ST TIEBEAM. 4/28/2020 3:20:00 PM Tie beam and elevated slab inspected. Contractor has submitted plans addressing engineering comments. If approved by engineering, we can release permit 4-28-20 12/11/2020 11:00:47 AM plan approved as per notes above.

 12/14/2020LOW VOLTAGE ROUGHDavid HayesDISAPPROVEDNOT READY. VERBAL INSTRUCTIONS GIVEN12/11/2020 12:47:57 PM VB

 12/14/2020ELECTRIC ROUGHDavid HayesDISAPPROVEDNOT READY. VERBAL INSTRUCTIONS GIVEN12/11/2020 12:47:37 PM VB

 12/14/2020DRYWALL SCREWWyatt T. HaygoodPARTIAL APPROVAL12/14/2020 10:42:02 AM all except garage

 12/21/2020WIND/DOOR ATTACHMENTWill JorgePARTIAL APPROVAL12/18/2020 3:33:21 PM ST 12/21/2020 12:57:33 PM upstairs windows and doors, less dormer roof windows

 12/22/2020LOW VOLTAGE ROUGHDavid HayesAPPROVED12/21/2020 4:17:47 PM JS

 12/22/2020ELECTRIC ROUGHDavid HayesAPPROVED12/21/2020 4:17:01 PM JS

 12/31/2020FRAMINGWill JorgeAPPROVED12/29/2020 3:59:00 PM JS

 01/12/2021WIND/DOOR ATTACHMENTWill JorgeDISAPPROVED1/11/2021 2:00:08 PM ST 1/12/2021 12:04:10 PM no additional work ready for inspection, pending - dormers, entry , adj.to entry window, big opening in back installed not ready

 01/12/2021DRYWALL SCREWWill JorgeAPPROVED1/11/2021 1:59:39 PM ST 1/12/2021 12:06:59 PM garages

 02/11/2021STRUCT MISC REPAIRWill JorgeAPPROVEDINSPECT LATH2/10/2021 3:46:25 PM PER VAL 2/11/2021 10:26:12 AM wire lath ceiling and framing supporting at drive thru also framing at entry clg.

 02/17/2021WIND/DOOR ATTACHMENTWill JorgePARTIAL APPROVAL2/16/2021 3:57:59 PM JS 2/17/2021 2:55:28 PM roof top dormer windows

 03/01/2021WIND/DOOR ATTACHMENTTony WillsonCANCELLED BY PERMITE2/26/2021 4:50:07 PM JS

 03/02/2021TILE IN PROGRESSWill JorgePARTIAL APPROVAL3/1/2021 1:36:51 PM ST 3/2/2021 3:06:56 PM Small amount complete on upper roof , resch. tomm

 03/09/2021TILE IN PROGRESSWill JorgeAPPROVED3/3/2021 2:35:19 PM 2 stops 3-3-21 no new work started due to stucco in progress at roof top dormers 3/5/2021 3:12:25 PM 3-5-21 8:20am gate locked resch.tues

 01/13/2020CONDENSATE LINERowdy GiffordAPPROVED

 04/30/2021ROOF TILE UPLIFT TSTWyatt T. HaygoodAPPROVED

 05/14/2021UNIT MASONRY CERTBill TracyAPPROVED5/14/2021 10:48:22 AM unit masonry, foundation and truss certification letters submitted from QEA

 05/14/2021LP TANK ROUGH-FIREBruce BowersAPPROVED5/13/2021 3:01:04 PM JS

 05/14/2021GASLINE RGH OUT-FIREBruce BowersAPPROVED5/13/2021 3:00:45 PM JS

 05/17/2021LP TANK ROUGH-PLUMJeremy HassenplugAPPROVED

 05/17/2021GAS LINE RGH OUT-PLJeremy HassenplugAPPROVED

 05/18/2021ROOF FINALWill JorgeAPPROVED5/17/2021 2:16:00 PM ST

 05/20/2021WATER SERVICEJan TranaDISAPPROVED5/20/2021 1:34:27 PM Not ready 5/20/2021 1:34:44 PM Not ready

 05/20/2021SEWER CONNECTIONJan TranaAPPROVED

 05/24/2021WATER SERVICEJeremy HassenplugAPPROVED

 06/03/2021DW SUBGRADE DENSITYBill TracyAPPROVED6/3/2021 4:08:48 PM density report submitted showing densities ranging from 98.9% to 100.4% Federal Engineering

 03/02/2021WIND/DOOR ATTACHMENTWill JorgeAPPROVED3/1/2021 7:48:55 AM VB 3/2/2021 3:11:18 PM pending entry door

 07/01/2021PLUMBING MISCJeremy HassenplugAPPROVED6/30/2021 2:53:37 PM JS 7/1/2021 12:42:22 PM See permit number 2103-0048 gas for fire bowls

 07/13/202130 DAY FOR TESTINGDavid HayesDISAPPROVEDNEED 30DAY APPLICATION. 110.9.17/12/2021 1:12:52 PM ST

 07/22/2021FOOTER/FOUNDATIONJoseph RobinsonAPPROVEDADD SITE WALL7/21/2021 3:01:23 PM JS

 08/02/202130 DAY FOR TESTINGDavid HayesAPPROVED

 08/11/2021COLUMNJoseph RobinsonDISAPPROVEDSITE WALL8/10/2021 3:49:01 PM JS 8/11/2021 11:14:32 AM Work in progress. Not ready for inspection. 8/11/2021 12:21:53 PM Work in progress. Not ready for inspection.

 08/13/2021COLUMNWill JorgeAPPROVEDSITE WALL8/12/2021 4:26:53 PM JS

 10/13/2021CAN/LAKE/SWALE/SLOPEPerry TabornAPPROVEDINSPECT SWALES/ GRADING

 02/02/2022IRRIGATION ROUGHJan TranaAPPROVED2/1/2022 11:12:03 AM VB 2/2/2022 1:12:11 PM COP by final

 02/24/2022COLUMNTony WillsonDISAPPROVEDSITE WALL2/23/2022 9:18:47 AM MT 2/24/2022 10:40:57 AM No permit card for side and rear precast fence. No fence inspection listed on the house permit for the front block wall and columns. FBC 107.3.1

 02/28/2022COLUMNTony WillsonAPPROVED2/25/2022 1:18:12 PM JS 2/28/2022 2:31:37 PM Front block wall and columns on footings. Final Inspection Completed. No inspection was on the main permit card.

 03/30/2022VENTILATION ROUGHDave Chin-SangCANCELLED BY PERMITEFireplace3/29/2022 1:13:08 PM ST 3/30/2022 9:52:13 AM Scott Sansone

 03/30/2022MECHANICAL FINALDave Chin-SangCANCELLED BY PERMITECOP ductwork3/29/2022 1:12:28 PM ST 3/30/2022 9:52:14 AM Needs COP duct work.

 03/30/2022DRIVEWAY STEEL/PAVERWill JorgeAPPROVED3/29/2022 1:10:32 PM ST

 03/30/2022PATIO SLAB/PAVERSWill JorgeAPPROVED3/29/2022 1:11:00 PM ST

 03/30/2022WIND/DOOR ATTACHMENTWill JorgeAPPROVEDENTRY DOOR3/29/2022 1:11:31 PM ST

 03/30/2022BALCONY RAIL/GRILLEWill JorgeAPPROVED3/29/2022 1:14:35 PM ST

 03/31/2022SEWER FINALJeremy HassenplugAPPROVED3/29/2022 1:11:58 PM ST

 04/13/2022LANDSCAPINGPatti HootAPPROVED4/12/2022 12:55:48 PM VB 4/13/2022 1:30:15 PM 38 trees and palm 12 accents hundreds of shrubs and ground cover

 04/19/2022MECHANICAL FINALDave Chin-SangPARTIAL APPROVAL4/18/2022 1:17:50 PM ST 4/19/2022 2:27:41 PM AH3 attic access blocked by water pipe.not accessible Copper line by C/U units needs to be strapped Plenum in attic #7 a/h needs to be supported' Mode #'s on (2) 4Ton A/H doesn't match. FV4-005 on plan 006 installed

 04/26/2022PLUMBING FINALJan TranaDISAPPROVEDSEE NOTES + COP REQ10/16/2020 8:13:23 AM 1/23/2020 12:06:25 PM (Bill Tracy) This property may by connected to a sanitary sewer line extension Either provide proof of application for sewer extension or Broward County approval for a septic tank prior to top out inspection 10/16/2020 12:08:04 PM Need COP/AS BUILTS BY FINAL. 4/26/2022 1:20:04 PM Not ready

 05/03/2022MECHANICAL FINALDave Chin-SangAPPROVED5/2/2022 12:34:46 PM ST 5/3/2022 10:37:05 AM (2) Fv4cnf 006 was installed instead of FV4cnf 005 on plan. 006 is more efficient. Approved without COP per Scott Wiesel

 05/03/2022LOW VOLTAGE FINALJoe NievesAPPROVEDTV,PHONE,ALARM,SPKS,VAC5/2/2022 12:22:05 PM ST

 05/03/2022ELECTRIC ROUGHJoe NievesAPPROVEDGENERATOR5/2/2022 12:20:11 PM ST

 05/03/2022ELECTRIC FINALJoe NievesDISAPPROVEDGENERATOR5/2/2022 12:20:45 PM ST 5/3/2022 10:46:21 AM Tech Required For Generator Start-Up And Test / FBC -BCA 107.1.3

 05/04/2022IRRIGATION FINALJan TranaAPPROVED5/3/2022 1:49:40 PM MT

 05/05/2022PLUMBING FINALJan TranaPARTIAL APPROVAL5/3/2022 4:35:23 PM ST 5/5/2022 12:14:22 PM Missing Roman tubs temperature limiting device West guest shower not draining 5/5/2022 12:15:09 PM Missing Roman tubs temperature limiting device West guest shower not draining

 05/05/2022ELECTRIC FINALJoe NievesDISAPPROVEDGENERATOR5/3/2022 4:32:58 PM ST 5/5/2022 1:09:10 PM Work Not Complete / FBC 110.9.1

 05/05/2022ELECTRIC FINALJoe NievesAPPROVEDHOUSE

 05/10/2022ELECTRIC FINALDean DiBisceglieAPPROVED5/9/2022 12:45:10 PM ST

 05/11/2022PLUMBING FINALJan TranaAPPROVED5/10/2022 4:08:56 PM ST

 05/13/2022TRUSSWyatt T. HaygoodAPPROVED5/12/2022 3:16:21 PM JS

 05/16/2022ZONING INSPECTIONJean PanebiancoAPPROVED5/13/2022 2:50:41 PM vb

 05/16/2022ENG DRAINAGEPerry TabornAPPROVEDINSPECT SWALES5/13/2022 2:51:02 PM vb

 05/17/2022ENG MISCPerry TabornAPPROVEDADD SITE WALL5/16/2022 3:49:14 PM VB

 05/17/2022NPDES InitialPerry TabornAPPROVEDSILT FENCE REPLACEMENT5/16/2022 3:49:37 PM VB

 05/17/2022VENTILATION ROUGHDave Chin-SangAPPROVEDN/A Ventless Fireplace

 05/18/2022UNDERGROUNDDean DiBisceglieAPPROVEDGENERATOR5/17/2022 10:32:16 AM MT

 04/20/2022FINAL GAS-PLUMBINGJeremy HassenplugDISAPPROVEDNEED COP4/19/2022 7:34:11 AM JS 4/19/2022 1:35:34 PM MT-CX BY SEBASTIAN 4/20/2022 10:47:05 AM No access

 05/24/2022BLOWER DOOR TESTBill TracyAPPROVED5/24/2022 10:44:54 AM 4.25 ACH(50) - PASS

 05/24/2022FINAL SURVEYWyatt T. HaygoodAPPROVED

 05/25/2022TIE BEAM/BONDJoseph RobinsonAPPROVEDADD SITE WALL5/24/2022 3:08:23 PM JS 5/25/2022 1:03:30 PM Inspected and approved at column inspection.

 05/27/2022FINAL GAS-PLUMBINGDave Chin-SangDISAPPROVED5/26/2022 4:05:49 PM ST 5/27/2022 11:10:36 AM All PVC regulator Vent piping needs to be supported. Barbecue Installation instructions required to verify structure venting. BFPA 58 6.8.6.1 (4) AG/ UG tank shall not be deeper than 12" below grade. (tank is 24" below) Tank regulator vent needs to be elevated to bottom of lid. Tank lid is less than 10' to driveway. Driveway lid or other protection required

 05/27/2022FINALWill JorgeAPPROVED5/26/2022 4:05:24 PM OK TO SCHED PER BILL

 05/31/2022FINAL GAS-PLUMBINGJeremy HassenplugDISAPPROVED5/27/2022 1:29:11 PM MT 5/31/2022 10:19:01 AM Not ready

 06/01/2022FINAL GAS-PLUMBINGJeremy HassenplugAPPROVED

ADMIN POOL COMPLETEVictoria BarriosVOIDED (BD26 6/1/2022)6/1/2022 3:19:14 PM Inspection voided by BD26.

 06/01/2022ADMIN CHECKLIST**Bill TracyAPPROVED