04/28/2024
7:43 PM
 
Permit No. BLDG2005-0085 Permit Type   ADDITION Site Address   6177 NW 75 WAY
PARKLAND, FL 330671249
Applied   05/13/2020 Applicant  
Approved   10/08/2020 Owner   MODY,DEEPAK & PANNA D
Issued   10/29/2020 Contractor   OWNER/BUILDER
Parent Permit No.   Description   MULTIPLE ADDITIONS
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 11/13/2020NOCVictoria BarriosAPPROVED

 01/21/2021NPDES InitialPerry TabornDISAPPROVED1/20/2021 3:35:22 PM JS 1/21/2021 2:23:19 PM No silt fence installed

 01/26/2021NPDES INITIALPerry TabornAPPROVEDPLEASE KNOCK FRONT DOOR1/25/2021 10:45:54 AM ST

 01/27/2021SERVICE GROUNDDavid HayesDISAPPROVED1/26/2021 12:39:05 PM wth 1/27/2021 2:14:19 PM Not ready.

 01/27/2021ELECTRIC DEMODavid HayesDISAPPROVED1/27/2021 2:14:22 PM Not ready. 1/27/2021 2:16:57 PM Not Ready

 02/03/2021SERVICE GROUNDDavid HayesAPPROVED

 02/03/2021ELECTRIC DEMODavid HayesAPPROVEDNOT REQUIRED

 02/04/2021SOIL TERMITE TREATBill TracyAPPROVED2/4/2021 12:53:11 PM .05% Imidacloprid

 02/04/2021SOIL BEARING CERTBill TracyAPPROVED2/4/2021 12:58:34 PM Statement of Fill from B3 Material Testing attesting to a bearing capacity of 3000PSF

 02/04/2021FOOTER/FOUNDATIONWill JorgeAPPROVEDStemwall Footing10/6/2020 8:38:13 AM Stemwall Footing 2/4/2021 2:22:08 PM plus entry and side of house slabs and footer mono see plan 2/4/2021 2:22:09 PM plus entry and side of house slabs and footer mono see plan

 03/01/2021TRUSS PLANS ON FILEWyatt T. HaygoodAPPROVED

 03/05/2021COLUMNWill JorgeAPPROVEDfront entry and rear stemwall to grade3/4/2021 3:26:18 PM wth

 03/11/2021SLABJoseph RobinsonAPPROVED3/10/2021 10:59:18 AM VB

 03/22/2021SEWER CONNECTIONJeremy HassenplugAPPROVEDnot necessary. no sanitary

 03/22/2021WATER SERVICEJeremy HassenplugAPPROVEDnot necessary. existing home

 03/22/2021TOP OUTJeremy HassenplugAPPROVEDnot necessary. no plumbing in addition

 03/22/2021GROUND ROUGHJeremy HassenplugAPPROVED3/19/2021 2:57:14 PM JS 3/22/2021 1:46:10 PM Rain water only

 03/26/2021CONSULTATIONDavid HayesAPPROVEDARE SERVICE CHANE & PANEL CHANGE READY?3/26/2021 8:13:49 AM ARE SERVICE CHANE & PANEL CHANGE READY? 3/26/2021 2:12:33 PM We discuss how to arrange with FPL how to build his new service.

 03/30/2021SPOT SURVEYZONINGAPPROVED3/30/2021 4:02:12 PM Must maintain 25' side setback. Spot survey does not match proposed approval plans. Have survey redone or remeasure. 4/1/2021 4:22:51 PM HOMEOWNER HAS DECIDED TO MOVE FORWARD WITH HIS PROJECT, THOUGH IT IS A NON-COMPLIANT STRUCTURE. ADDITION ENCROACHES SETBACK BY .35 FEET. ELEVATION OF SLAB OK.

 04/02/2021TIE BEAM/BONDWill JorgeAPPROVEDper notes4/2/2021 8:07:21 AM Tie Beam inspection done with homeowner /builder understanding that new addition is non compliant with required setbacks and proceeding with project is at own risk.

 04/14/2021RAKE BEAMWill JorgeAPPROVED4/13/2021 3:36:01 PM wth

 04/30/2021ROOF SHEATHINGWill JorgeAPPROVED4/29/2021 3:38:08 PM ST

 05/11/2021TIN CAPWill JorgeDISAPPROVED5/10/2021 1:42:00 PM ST 5/11/2021 1:54:29 PM repair tears in 30# felt, prime metal

 05/11/2021SHINGLE IN PROGRESSWill JorgeDISAPPROVED5/10/2021 1:42:37 PM ST 5/11/2021 1:54:48 PM tin cap failed

 05/12/2021TIN CAPWill JorgeAPPROVED5/12/2021 2:45:46 PM slope roofs

 05/14/2021SHINGLE IN PROGRESSWyatt T. HaygoodDISAPPROVED5/14/2021 3:09:23 PM Nails in shingles are overdriven and are cutting through shingles.

 05/18/2021UNIT MASONRY CERTWyatt T. HaygoodAPPROVED5/18/2021 7:18:03 AM Steel Reinforcement inspection report submitted.

 05/18/2021WALL SHEATHINGWill JorgeAPPROVED

 05/19/2021SHINGLE IN PROGRESSWyatt T. HaygoodDISAPPROVED5/18/2021 11:57:46 AM vb

 05/20/2021SHINGLE IN PROGRESSWill JorgeDISAPPROVED5/19/2021 3:45:12 PM wth 5/20/2021 3:36:32 PM nailing too close to bottom of tab, need roofers on site for upcoming inspection

 05/21/2021SHINGLE IN PROGRESSWyatt T. HaygoodAPPROVED5/21/2021 7:43:10 AM wth

 05/25/2021ROOF FINALJoseph RobinsonAPPROVED5/25/2021 5:25:58 PM Only shingle roof inspected.

 08/02/2021WIND/DOOR BUCKTony WillsonAPPROVED

 08/18/2021WIND/DOOR ATTACHMENTWill JorgeDISAPPROVED8/17/2021 3:30:37 PM JS 8/18/2021 1:19:51 PM 1/4" max. shim space, solid bucking required, 2x buck installed not inspected, need rep from co. to reveal sill anchors at HR windows, missing shims at certain windows... inspection stopped

 08/26/2021WIND/DOOR ATTACHMENTWill JorgeAPPROVED8/25/2021 3:50:12 PM ST

 01/26/2022ROUGH DUCTDave Chin-SangAPPROVED1/25/2022 9:21:15 AM MT

 02/02/2022ELECTRIC ROUGHDean DiBiscegliePARTIAL APPROVAL2/1/2022 1:06:03 PM VB

 03/18/2022SERVICE CHANGEDavid HayesPARTIAL APPROVALFPL WILL BE THERE AT 9AM3/16/2022 10:32:36 AM MT-FPL WILL BE THERE AT 9AM 3/18/2022 4:28:32 PM Still needs a final.

 03/29/2022CONDENSATE LINEJeremy HassenplugAPPROVED

 03/29/2022PLUMBING FINALJeremy HassenplugAPPROVED

 04/12/2022SERVICE CHANGEDean DiBisceglieAPPROVED

 04/19/2022ELECTRIC ROUGHJoe NievesAPPROVED4/18/2022 9:59:10 AM vb

 07/11/2022DRYWALL SCREWWyatt T. HaygoodAPPROVED7/8/2022 4:10:45 PM MT

 07/15/2022PRODUCT APPROVALSWyatt T. HaygoodAPPROVED

 07/18/2022EXHAUST ROUGHScott WieselDISAPPROVED7/15/2022 8:09:19 AM wth 7/18/2022 11:50:13 AM No entry

 07/18/2022LOW VOLTAGE ROUGHJoe NievesAPPROVEDCATV, DATA & SPKRS7/15/2022 8:09:43 AM wth 7/18/2022 1:40:42 PM Low Voltage Rough Approved/ Work Covered No Access. 7/18/2022 1:41:04 PM Low Voltage Rough Approved/ Work Covered No Access.

 07/18/2022SCREEN BONDDavid HayesDISAPPROVEDSEE NOTES.7/15/2022 8:11:55 AM wth 7/18/2022 11:26:06 AM BOND METAL DOORS TO EQUIPOTENTIAL BOND 8/4/2021 12:13:30 PM 7/18/2022 1:43:35 PM Required Bonding of metal doors within 5ft of the pool is complete but work is covered. Engineering letter required for all work that has been covered prior to inspection. 7/18/2022 1:46:06 PM Work covered. Provide an engineering letter for all work covered prior to inspection.

 07/20/2022FRAMINGWill JorgeDISAPPROVED7/19/2022 11:30:38 AM MT 7/20/2022 3:50:00 PM missed inspection worked covered, previously inspected 7/21/2022 3:59:38 PM work covered prior to inspection unable to verify any corrections required. Need homeowner affidavit for missed mandatory inspections

 07/21/2022INSULATIONWill JorgeDISAPPROVED7/20/2022 4:42:17 PM MT 7/21/2022 4:00:04 PM work covered prior to inspection unable to verify any corrections required. Need homeowner affidavit for missed mandatory inspections

 07/25/2022EXHAUST ROUGHScott WieselAPPROVED7/22/2022 10:18:33 AM MT

 07/27/2022FRAMINGBill TracyAPPROVED7/27/2022 4:19:30 PM RECEIVED A MISSED INSPECTION AFFIDAVIT FROM OWNER-BUILDER, Mr. MODY, ATTESTING TO COMPLIANCE WITH THE CODE

 07/27/2022INSULATIONBill TracyAPPROVED7/27/2022 4:20:07 PM RECEIVED A MISSED INSPECTION AFFIDAVIT FROM OWNER-BUILDER, Mr. MODY, ATTESTING TO COMPLIANCE WITH THE CODE

 07/27/2022SCREEN BONDBill TracyAPPROVEDSEE NOTES7/27/2022 4:22:06 PM RECEIVED A MISSED INSPECTION AFFIDAVIT FROM OWNER-BUILDER, Mr. MODY, ATTESTING TO COMPLIANCE WITH THE CODE. Mr. MODY IS AN ELECTRICAL ENGINEER, SO IS DEEMED TO BE QUALIFIED TO ATTEST TO COMPLIANCE

 04/30/2021TRUSSWill JorgeAPPROVED

 05/18/2021WIRE LATHBill TracyAPPROVED7/27/2022 4:28:27 PM DEEMED TO COMPLY BY SUBMITTAL OF UNIT MASONRY CERTIFICATION

 08/23/2022ENG MISCPerry TabornAPPROVED8/22/2022 2:52:53 PM VB

 08/23/2022SCREEN ENCLOSUREJoseph RobinsonAPPROVED8/22/2022 2:55:54 PM ST

 09/12/2022FINAL SURVEYBill TracyAPPROVED9/12/2022 4:40:06 PM AH-15+1 ZONE GARAGE EXISTING

 10/25/2022LOW VOLTAGE FINALJoe NievesAPPROVEDCATV, DATA & SPKRS10/24/2022 12:50:58 PM ST

 10/25/2022MECHANICAL FINALDave Chin-SangDISAPPROVED10/25/2022 11:22:20 AM Not ready, A/H opening to attic. Inspection not done

 11/29/2022MECHANICAL FINALDave Chin-SangDISAPPROVED11/28/2022 9:39:44 AM ST 11/29/2022 12:21:19 PM Approved plans not on site. 3Ton A/H model numbers doesn't match. Condensate drain line in unconditioned attic needs to be insulated. Needs COP for model numbers, Condensate location, Return grill size. For 3T. Bi-fold doors for 5Ton Low voltage wires @C/U needs to be protected.

 12/08/2022ZONING INSPECTIONJean PanebiancoAPPROVED12/7/2022 2:36:46 PM CJ

 12/15/2022MECHANICAL FINALDave Chin-SangDISAPPROVED12/14/2022 1:53:17 PM MT 12/15/2022 10:54:48 AM Previous comment wasn't addressed Browsed County BORA formal interpretation #3 Horizontal condensate lines within unconditioned areas shall be insulated. Condensate Pump on plans for 3Ton unit not installed. Not needed. Not an issue. See photos

 12/27/2022ELECTRIC FINALJoe NievesAPPROVED12/23/2022 12:39:43 PM CJ

 12/29/2022MECHANICAL FINALScott WieselAPPROVED12/28/2022 4:50:26 PM vb

 01/19/2023FINALJoseph RobinsonAPPROVED1/18/2023 2:59:23 PM an

 01/20/2023ADMIN CHECKLIST**Juan SotoAPPROVED10/25/2022 5:50:36 PM FINAL TERMITE TREATMENT SUBMITTED