04/14/2021 | PRODUCT APPROVALS | Bill Tracy | APPROVED | | |
|
04/26/2021 | NOC | Debbie Grosse | APPROVED | | |
|
04/29/2021 | NPDES Initial | Perry Taborn | APPROVED | | 4/28/2021 7:59:51 AM
City of Parkland Request for Inspection Form
Permit Number 21010013
First Name Adriano
Last Name Cartelli
Company Torcon USA, Inc
Phone Number 5619894991
Email Address torconusa@outlook.com
Type of Inspection(s) Requested NPDES Initial
Request Date 4/29/2021
|
|
05/18/2021 | SEWER CONNECTION | Jeremy Hassenplug | APPROVED | | 5/17/2021 4:15:21 PM
ST
5/17/2021 4:15:42 PM
Request For Inspection
City of Parkland Request for Inspection Form
Permit Number 21010013
First Name Adriano
Last Name Cartelli
Company Torcon USA, Inc
Phone Number 5619894991
Email Address torconusa@outlook.com
Type of Inspection(s) Requested Plumbing: 2: Sewer connection
Request Date 5/18/2021
Instructions/Example
If you desire an inspection on the 28th, your request must be submitted by 4:00PM on the 27th.
Additional Information
Contractors can schedule inspections online by going to https://www.cityofparkland.org/epermit. If you are a contractor and do not have access to Etrakit please contact the Building Department to get directions for scheduling inspections online. Contractors can cancel inspections online up to 6:00am via the online portal. Same day inspection cancellations you must contact the Building Department via telephone between 7:30 and 8:00 AM at (954) 753-5447.
|
|
05/19/2021 | WATER SERVICE | Jan Trana | APPROVED | | |
|
05/19/2021 | GROUND ROUGH | Jan Trana | DISAPPROVED | | 5/19/2021 2:42:11 PM
No water in sanitary
|
|
05/21/2021 | GROUND ROUGH | Jan Trana | DISAPPROVED | | 5/19/2021 3:15:42 PM
vb
5/21/2021 12:05:39 PM
No water in sanitary
|
|
05/21/2021 | CONDENSATE LINE | Jan Trana | DISAPPROVED | | 5/20/2021 1:29:39 PM
vb
5/21/2021 12:05:42 PM
Not ready
|
|
05/21/2021 | SERVICE GROUND | David Hayes | DISAPPROVED | NOT READY. | 5/20/2021 1:30:08 PM
vb
5/21/2021 1:51:06 PM
Nothing installed for grounding yet.
|
|
05/21/2021 | UNDERGROUND | David Hayes | PARTIAL APPROVAL | FEED TO PANEL AND FLOOR BOX | |
|
05/25/2021 | SERVICE GROUND | Dean DiBisceglie | APPROVED | | 5/24/2021 4:41:51 PM
vb
|
|
05/25/2021 | GROUND ROUGH | Jan Trana | APPROVED | | 5/24/2021 4:41:41 PM
vb
|
|
05/25/2021 | CONDENSATE LINE | Jan Trana | DISAPPROVED | | 5/24/2021 4:41:12 PM
vb
5/25/2021 11:28:02 AM
Not ready
|
|
05/26/2021 | CONDENSATE LINE | Jan Trana | APPROVED | | |
|
06/02/2021 | SOIL BEARING CERT | Bill Tracy | APPROVED | | 6/2/2021 5:13:07 PM
STATEMENT OF SOIL BEARING FROM PANGEO CONSULTANTS, WITH DENSITIES, ATTESTING TO A BEARING CAPACITY OF 3000 PSF
|
|
06/02/2021 | SOIL TERMITE TREAT | Bill Tracy | APPROVED | | 6/2/2021 5:14:15 PM
.1% IMIDACLOPRID
|
|
06/03/2021 | TRUSS PLANS ON FILE | Bill Tracy | APPROVED | SUBMITTED ONLY | |
|
06/04/2021 | SLAB | Will Jorge | APPROVED | | 6/3/2021 1:33:53 PM
Request For Inspection
City of Parkland Request for Inspection Form
Permit Number 21010013
First Name adriano
Last Name Cartelli
Company Torcon USA, Inc
Phone Number 5619894991
Email Address torconusa@outlook.com
Type of Inspection(s) Requested Structural: Slab inspection
Request Date 6/4/2021
Instructions/Example
If you desire an inspection on the 28th, your request must be submitted by 4:00PM on the 27th.
Additional Information
Contractors can schedule inspections online by going to https://www.cityofparkland.org/epermit. If you are a contractor and do not have access to Etrakit please contact the Building Department to get directions for scheduling inspections online. Contractors can cancel inspections online up to 6:00am via the online portal. Same day inspection cancellations you must contact the Building Department via telephone between 7:30 and 8:00 AM at (954) 753-5447.
|
|
06/15/2021 | SPOT SURVEY | Wyatt T. Haygood | APPROVED | | |
|
06/03/2021 | SPOT SURVEY | Bill Tracy | DISAPPROVED | | 6/3/2021 12:02:14 PM
missing slab inspection
|
|
06/25/2021 | TIE BEAM/BOND | Will Jorge | APPROVED | | 6/24/2021 1:34:05 PM
ST
|
|
07/02/2021 | UNIT MASONRY CERT | Bill Tracy | APPROVED | | 7/2/2021 12:01:02 PM
UNIT MASONRY CERTIFICATION SUBMITTED BY ALI YEMENICILER, PE
|
|
07/20/2021 | ROOF SHEATHING | Will Jorge | APPROVED | | |
|
07/20/2021 | WALL SHEATHING | Will Jorge | APPROVED | | |
|
07/20/2021 | TRUSS | Will Jorge | APPROVED | | |
|
07/22/2021 | TIN CAP | Alejandro Corrales | APPROVED | | 7/21/2021 11:49:20 AM
wth
|
|
07/22/2021 | HOT MOP IN PROGRESS | Alejandro Corrales | DISAPPROVED | | 7/21/2021 12:56:49 PM
VB
7/22/2021 4:54:33 PM
1) peel and stick cap sheets must be completed 100% before scheduling inspection. Only actual hot mop applications shall be inspected in progress. Please finish installing peel and stick caps sheet and reschedule hot mop inspection
|
|
07/28/2021 | HOT MOP IN PROGRESS | Will Jorge | APPROVED | | |
|
08/09/2021 | WIND/DOOR BUCK | Tony Willson | APPROVED | | 8/6/2021 2:04:34 PM
ST
|
|
08/31/2021 | LOW VOLTAGE ROUGH | Dean DiBisceglie | APPROVED | | |
|
08/31/2021 | ELECTRIC ROUGH | Dean DiBisceglie | APPROVED | | |
|
08/31/2021 | EXHAUST ROUGH | Dave Chin-Sang | DISAPPROVED | | 8/31/2021 12:09:03 PM
Roof termination not connected
|
|
08/31/2021 | ROUGH DUCT | Dave Chin-Sang | DISAPPROVED | | 8/31/2021 12:09:04 PM
Main supply trunk line touching roof deck. Unable to spray foam.
|
|
08/31/2021 | WIRE LATH | Joseph Robinson | APPROVED | | |
|
08/31/2021 | WIND/DOOR ATTACHMENT | Joseph Robinson | PARTIAL APPROVAL | EXCEPT FRONT DOOR | 8/31/2021 1:57:37 PM
Pending front door.
|
|
09/07/2021 | ROUGH DUCT | Dave Chin-Sang | APPROVED | | |
|
09/07/2021 | EXHAUST ROUGH | Dave Chin-Sang | APPROVED | | |
|
09/07/2021 | SHOWER PAN | Jeremy Hassenplug | APPROVED | | |
|
09/07/2021 | TOP OUT | Jeremy Hassenplug | APPROVED | | |
|
09/08/2021 | FRAMING | Joseph Robinson | DISAPPROVED | | 9/8/2021 3:28:42 PM
Draft stop incomplete.
Multiple penetrations in top track.
Furring incomplete.
|
|
09/10/2021 | FRAMING | Alejandro Corrales | DISAPPROVED | | 9/10/2021 1:57:24 PM
1) Furring incomplete. Draft stop at top of wall no done. There is a gap above most of the furring strips. There should be a piece of furring or foam blocking airflow within the wall every 10 feet. Air and smoke shall not move through the wall more than 10 feet in any direction.
2) Exterior wall penetrations shall be stuccoed, not foamed. Stucco any penetrations and recessed electrical boxes in block wall. PROTECT COPPER PIPES FROM STUCCO AND FROM BARE BLOCK.. SHOULD BE SLEEVED.
3) some top track penetrations needing foam, marked on floor with sharpie.
|
|
09/13/2021 | FRAMING | Wyatt T. Haygood | APPROVED | | |
|
09/15/2021 | INSULATION | Joseph Robinson | APPROVED | SPRAY FOAM | 9/14/2021 7:14:49 AM
Request For Inspection
City of Parkland Request for Inspection Form
Permit Number 21010013
First Name Adriano
Last Name Cartelli
Company Torcon USA, Inc
Phone Number 5619894991
Email Address torconusa@outlook.com
Type of Inspection(s) Requested Structural: Insulation
Request Date 9/14/2021
Instructions/Example
If you desire an inspection on the 28th, your request must be submitted by 4:00PM on the 27th.
Additional Information
Contractors can schedule inspections online by going to https://www.cityofparkland.org/epermit. If you are a contractor and do not have access to eTRAKiT please contact the Building Department to get directions for scheduling inspections online. Contractors can cancel inspections online up to 6:00am via the online portal. Same day inspection cancellations you must contact the Building Department via telephone between 7:30 and 8:00 AM at 954.753.5447.
|
|
09/16/2021 | TILE IN PROGRESS | Will Jorge | CANCELLED BY PERMITE | | 9/16/2021 7:48:30 AM
holiday
|
|
09/20/2021 | TILE IN PROGRESS | Wyatt T. Haygood | APPROVED | | 9/16/2021 8:05:09 AM
City of Parkland Request for Inspection Form
Permit Number 21010013
First Name Adriano
Last Name Cartelli
Company Torcon USA, Inc
Phone Number 5619894991
Email Address torconusa@outlook.com
Type of Inspection(s) Requested Structural: Roof tile in progress
Request Date 9/20/2021
|
|
09/21/2021 | DRYWALL SCREW | Joseph Robinson | APPROVED | | 9/20/2021 4:02:51 PM
VB
|
|
09/22/2021 | ROOF TILE UPLIFT TST | Bill Tracy | APPROVED | | 9/22/2021 1:56:34 PM
UPLIFT REPORT SUBMITTED FROM ACB2 ENGINEERING - PASS
|
|
10/01/2021 | ROOF FINAL | Alejandro Corrales | APPROVED | | 9/30/2021 7:25:37 AM
City of Parkland Request for Inspection Form
Permit Number 21010013
First Name Adriano
Last Name Cartelli
Company Torcon USA, Inc
Phone Number 5619894991
Email Address torconusa@outlook.com
Type of Inspection(s) Requested Structural: Roof final
Request Date 10/1/2021
|
|
10/12/2021 | SHOWER PAN | Jan Trana | APPROVED | WALL WATERPROOFING | |
|
12/22/2021 | ZONING INSPECTION | Jean Panebianco | APPROVED | | |
|
12/22/2021 | LOW VOLTAGE FINAL | Dean DiBisceglie | APPROVED | | |
|
12/22/2021 | ELECTRIC FINAL | Dean DiBisceglie | APPROVED | | |
|
12/22/2021 | ENG MISC | Perry Taborn | APPROVED | Check grading around building | |
|
12/22/2021 | PLUMBING FINAL | Jeremy Hassenplug | APPROVED | | |
|
12/22/2021 | MECHANICAL FINAL | Dave Chin-Sang | DISAPPROVED | | 12/22/2021 1:09:53 PM
A/C equipment doesn't mat approved plan. Plan shows 2tons 17 seer.
2..5 tons 14seer installed.
Low voltage wire to c/u needs protection.
C.O.P Required for return grill location
|
|
12/22/2021 | FINAL SURVEY | Bill Tracy | APPROVED | | |
|
01/11/2022 | BLOWER DOOR TEST | Dave Chin-Sang | APPROVED | | 4/13/2021 5:30:26 PM
ACH Max 5.0
|
|
02/10/2022 | MECHANICAL FINAL | Dave Chin-Sang | DISAPPROVED | | 2/9/2022 4:08:32 PM
MT
2/10/2022 9:39:38 AM
Condensate termination needs to be minimum 12" away from wall.
Corrections not done supply plenum not sealed.
Low voltage wires needs protection @C/U
|
|
02/11/2022 | MECHANICAL FINAL | Dave Chin-Sang | APPROVED | PER Photos | |
|
03/15/2022 | UNDERGROUND | Joe Nieves | APPROVED | FEED FROM SERVICE | 3/15/2022 2:28:21 PM
Partial Underground Approved On 5-2-2021
All Underground Covered / 3-15-2022
3/15/2022 2:29:09 PM
Partial Underground Approved On 5-2-2021
All Underground Covered / 3-15-2022
|
|
03/15/2022 | WIND/DOOR ATTACHMENT | Will Jorge | APPROVED | | |
|
03/16/2022 | FINAL | Will Jorge | APPROVED | | |
|
04/22/2022 | ADMIN CHECKLIST** | Victoria Barrios | APPROVED | | |
|