Permit No. BLDG2106-0216 Permit Type   ADDITION Site Address   10301 LAKE VISTA CT
PARKLAND, FL 33076
Applied   06/18/2021 Applicant  
Approved   09/08/2021 Owner   ANDRADE,WAGNER P & CARLA
Issued   10/04/2021 Contractor   EAGLE CONCRETE CORP.
Parent Permit No.   Description   COVERED PATIO ADDITION
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 09/08/2021TRUSS PLANS ON FILEWyatt T. HaygoodAPPROVED

 10/18/2021NOCStephanie TaylorAPPROVED

 10/19/2021UNDERGROUNDDavid HayesCANCELLED BY PERMITE10/18/2021 5:12:12 PM VB 10/19/2021 8:23:35 AM CX BY MONIQUE

 10/20/2021SEWER CONNECTIONJan TranaAPPROVED

 10/20/2021GAS LINE RGH OUT-PLJan TranaDISAPPROVED10/19/2021 2:32:43 PM VB 10/20/2021 12:57:18 PM Not per plan

 10/20/2021GROUND ROUGHJan TranaAPPROVED10/19/2021 2:33:01 PM VB

 11/05/2021SOIL BEARING CERTBill TracyAPPROVED11/5/2021 5:48:59 PM PROCTOR COMPACTION AND FIELD DENSITY TEST FROM EASTCOAST TESTING & ENGINEERING

 11/09/2021SOIL TERMITE TREATWyatt T. HaygoodAPPROVED

 11/16/2021SLABTony WillsonAPPROVED11/15/2021 3:27:56 PM ST 11/16/2021 4:20:44 PM Covered Patio and Fire Pit Foundations.

 12/08/2021SPOT SURVEYBill TracyAPPROVED12/8/2021 3:31:29 PM ELEVATION ON SURVEY INCORRECT - EXISTING SLAB AT 12.32 NAVD, NOT 9.64 THEREFORE, COVERED PATIO ADDITION IS AT 11.86, NOT 9.18

 12/09/2021TIE BEAM/BONDJoseph RobinsonAPPROVED

 12/09/2021COLUMNJoseph RobinsonAPPROVED12/8/2021 5:18:14 PM vb

 12/15/2021GAS LINE RGH OUT-PLJan TranaAPPROVED12/15/2021 5:53:47 AM NEED COP BY FINAL

 12/16/2021ROOF SHEATHINGWill JorgeAPPROVED12/15/2021 3:36:52 PM VB

 12/16/2021TRUSSWill JorgeAPPROVED12/15/2021 3:37:14 PM VB

 12/17/2021TIN CAPWill JorgeAPPROVED12/16/2021 3:40:48 PM MT

 12/21/2021ELECTRIC ROUGHJoe NievesAPPROVED12/20/2021 12:54:37 PM JS

 12/22/2021HOT MOP IN PROGRESSWill JorgeAPPROVED12/21/2021 3:57:08 PM JS

 12/22/2021UNIT MASONRY CERTBill TracyAPPROVED12/22/2021 2:45:39 PM LETTER FROM PAUL ORR, PE 64898

 12/23/2021WIRE LATHWill JorgeAPPROVED12/22/2021 2:43:32 PM VB

 12/23/2021TILE IN PROGRESSWill JorgeAPPROVED12/22/2021 2:43:53 PM VB

 01/05/2022ROOF FINALAlejandro CorralesAPPROVED

 01/26/2022EXHAUST HOOD ROUGHDave Chin-SangDISAPPROVED1/25/2022 1:49:32 PM vb 1/26/2022 9:55:34 AM Work not to -plan. Incorrect roof jack, Approved plan shows 8" duct. 6" foil duct ran and reduced to 4" FBC/Res M1503.1

 01/26/2022LOW VOLTAGE ROUGHCAP Gov ELAPPROVEDNOT APPLICABLE. NO LV WORK

 01/26/2022LOW VOLTAGE FINALCAP Gov ELAPPROVED

 01/26/2022ELECTRIC FINALCAP Gov ELDISAPPROVED1/26/2022 12:37:32 PM 1. EXTERIOR W/P EXTRA DUTY BUBBLE COVERS REQUIRED FOR EXTERIOR RECEPTACLES. NEC 406.9

 01/27/2022GAS LINE RGH IN-PLJan TranaAPPROVED

 01/27/2022ELECTRIC FINALCAP Gov ELAPPROVED1/26/2022 3:53:31 PM ST

 01/28/2022FINAL GAS-PLUMBINGJan TranaDISAPPROVEDCOP REQ1/28/2022 1:34:37 PM Need COP

 01/28/2022PLUMBING FINALJan TranaAPPROVED

 01/31/2022EXHAUST HOOD ROUGHScott WieselAPPROVED1/28/2022 1:29:39 PM MT

 01/31/2022VENTILATION ROUGHScott WieselAPPROVEDBarbeque structure

 02/01/2022EXHAUST HOOD FINALScott WieselAPPROVED2/2/2022 9:34:44 AM vb 2/2/2022 12:13:19 PM PER PDF OF PERMIT CARD

 02/02/2022ZONING INSPECTIONJean PanebiancoAPPROVED1/31/2022 9:03:21 AM vb

 02/03/2022MECHANICAL FINALScott WieselAPPROVED

 02/11/2022FINAL SURVEYBill TracyAPPROVED5/26/2022 9:45:30 AM X-LOMR-F CASE # 16-04-7729P

 02/25/2022FINAL GAS-PLUMBINGJan TranaAPPROVED2/24/2022 2:06:50 PM vb

 02/25/2022TOP OUTJan TranaAPPROVED2/24/2022 2:07:05 PM vb

 02/25/2022FRAMINGTony WillsonDISAPPROVED2/24/2022 2:07:25 PM vb 2/25/2022 2:55:37 PM No approved plan or permit card posted. FBC 107.3.1 / 105.7 Nobody answered the front door. Rang door bell and knocked. Dog barking.

 02/25/2022DRYWALL SCREWTony WillsonDISAPPROVED2/24/2022 2:07:56 PM vb 2/25/2022 2:55:39 PM No approved plan or permit card posted. FBC 107.3.1 / 105.7 Nobody answered the front door. Rang door bell and knocked. Dog barking.

 02/25/2022UNDERGROUNDCAP Gov ELDISAPPROVED2/24/2022 2:06:37 PM vb 2/25/2022 3:21:24 PM FBC 110.6 Work shall not be covered upon prior to inspection

 04/12/2022UNDERGROUNDPedro VieiraDISAPPROVED4/11/2022 9:51:47 AM ST 4/12/2022 1:29:30 PM FBC 110.6 Work shall not be covered upon prior to inspection Pictures or engineer letter

 04/12/2022DRYWALL SCREWJoseph RobinsonDISAPPROVED4/11/2022 9:52:08 AM ST 4/12/2022 4:52:22 PM No answer at door. No access.

 04/12/2022FRAMINGJoseph RobinsonDISAPPROVED4/11/2022 9:52:39 AM ST 4/12/2022 4:53:00 PM No answer at door. No access.

 05/04/2022FRAMINGJoseph RobinsonAPPROVED5/2/2022 9:09:54 AM ST

 05/04/2022DRYWALL SCREWJoseph RobinsonAPPROVED

 05/04/2022FINALJoseph RobinsonAPPROVED

 05/18/2022UNDERGROUNDPedro VieiraDISAPPROVED5/2/2022 9:09:01 AM ST 5/18/2022 9:47:38 AM FBC 110.6 Work shall not be covered upon prior to inspection

 11/15/2021UNDERGROUNDDavid HayesAPPROVED

 05/24/2022ADMIN CHECKLIST**Victoria BarriosAPPROVED