05/25/2023 | NOC | Victoria Barrios | APPROVED | | 5/25/2023 4:28:39 PM
MT
|
|
05/26/2023 | ELECTRIC ROUGH | Rinor Krasniqi | DISAPPROVED | | 5/25/2023 4:29:26 PM
MT
5/26/2023 9:30:13 AM
Generator not level
For final look for 2" concrete on top of underground conduit
|
|
05/26/2023 | UNDERGROUND | Rinor Krasniqi | APPROVED | | 5/26/2023 3:52:46 PM
MUST HAVE 2" OF CONCRETE PHOTOS FOR FINAL
|
|
06/01/2023 | ELECTRIC ROUGH | Pedro Vieira | DISAPPROVED | | 5/31/2023 3:20:26 PM
MT
6/1/2023 9:05:46 AM
an
6/1/2023 9:21:22 AM
No plans on site
|
|
06/02/2023 | ELECTRIC ROUGH | Pedro Vieira | APPROVED | | 6/1/2023 9:48:59 AM
an
6/2/2023 7:04:40 AM
Inspector EL18 changed the inspection assignment from EL18 to EL16
|
|
06/08/2023 | GAS LINE RGH OUT-PL | Jan Trana | DISAPPROVED | | 6/8/2023 12:05:15 PM
Work completed without test
|
|
06/09/2023 | GAS LINE RGH OUT-PL | Dave Chin-Sang | DISAPPROVED | | 6/8/2023 4:55:19 PM
ST
6/9/2023 9:36:58 AM
Line losing pressure
COP required for final
|
|
06/13/2023 | GAS LINE RGH OUT-PL | Dave Chin-Sang | DISAPPROVED - FEE | | 6/12/2023 1:52:57 PM
VB
6/13/2023 9:23:02 AM
Line losing pressure 3rd visit
|
|
06/14/2023 | GAS LINE RGH OUT-PL | Dave Chin-Sang | APPROVED | | 6/13/2023 2:44:02 PM
vb
|
|
10/06/2023 | MECHANICAL FINAL | Dave Chin-Sang | APPROVED | | 10/5/2023 3:43:43 PM
vb
|
|
10/06/2023 | FINAL GAS-PLUMBING | Jan Trana | DISAPPROVED | | 10/5/2023 3:39:30 PM
FM
10/6/2023 11:19:30 AM
Regulator vent port pipe and fittings shall be UL 651
A union shall be installed before regulator
10/6/2023 11:19:51 AM
Regulator vent port pipe and fittings shall be UL 651
A union shall be installed before regulator
|
|
10/10/2023 | LANDSCAPING | Patti Hoot | APPROVED | | 10/5/2023 3:43:12 PM
vb
|
|
11/22/2023 | FINAL GAS-PLUMBING | Scott Wiesel | DISAPPROVED | | 11/21/2023 1:47:06 PM
ST
11/22/2023 7:52:28 AM
sw
11/22/2023 12:57:51 PM
Missing screen on vent no plans or permit card
|
|
12/01/2023 | FINAL GAS-PLUMBING | Jan Trana | APPROVED | | 11/29/2023 3:13:36 PM
FM
|
|
12/12/2023 | ELECTRIC FINAL** | Rinor Krasniqi | APPROVED | MUST HAVE 2" OF CONCRETE PHOTOS FOR FINA | 12/11/2023 2:00:59 PM
JS
|
|