05/02/2024
3:16 PM
 
Permit No. POOL2008-0266 Permit Type   POOLS/SPA/REMODEL/WF Site Address   11019 NW 62 CT
PARKLAND, FL 33076
Applied   08/27/2020 Applicant  
Approved   10/16/2020 Owner   SIQUEIRA,ISMAR RICARDO DE BARR
Issued   10/21/2020 Contractor   PQS POOL AND PATIO RENOVATIONS LLC
Parent Permit No.   Description   POOL/ALARM/DECK (EXISTING SCREEN ENC #1610-0185)
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 10/21/2020NOCDebbie GrosseAPPROVED

 03/08/2021NPDES INITIALPerry TabornDISAPPROVED3/8/2021 11:47:40 AM No silt fence installed 3/8/2021 11:49:11 AM No silt fence installed

 03/09/2021NPDES INITIALPerry TabornAPPROVED3/8/2021 3:17:24 PM ST 3/9/2021 8:58:57 AM Maintain fence

 03/11/2021MAIN DRAINJan TranaDISAPPROVED3/9/2021 3:07:35 PM JS 3/11/2021 11:22:13 AM Low line pressure

 03/11/2021ELEC POOL STEEL BONDJoe NievesAPPROVED3/9/2021 3:07:24 PM JS

 03/11/2021POOL STEELAlejandro CorralesDISAPPROVED3/9/2021 3:07:45 PM JS 3/11/2021 1:55:59 PM 1) On page 4 pool wall detail, plan calls for an 8x8 band beam with (3) #3s. Currently the pool only has (1) #3 in the bond beam. Add steel , double check steel against page 4 of plan and reschedule.

 03/16/2021MAIN DRAINJeremy HassenplugDISAPPROVED3/15/2021 10:09:47 AM VB 3/16/2021 2:01:51 PM Low line pressure

 03/16/2021POOL STEELAlejandro CorralesAPPROVED3/15/2021 10:09:59 AM VB

 03/18/2021MAIN DRAINJan TranaAPPROVED3/17/2021 1:35:25 PM la

 03/19/2021UNDERGROUNDDean DiBisceglieAPPROVED3/18/2021 3:15:01 PM JS

 03/19/2021ENG ROUGH GRADEPerry TabornAPPROVED3/18/2021 3:14:38 PM JS 3/19/2021 9:36:28 AM Restore side swales for positive drainage

 03/19/2021PERIMETER PIPINGJan TranaDISAPPROVED3/18/2021 3:14:50 PM JS 3/19/2021 1:16:16 PM Not ready

 05/11/2021PERIMETER PIPINGJeremy HassenplugAPPROVED5/10/2021 3:47:17 PM ST

 05/11/2021DECK BONDDavid HayesDISAPPROVED5/10/2021 3:47:43 PM ST 5/11/2021 4:00:38 PM 1 Please read NEC 680.26 and try again. 2. Please read the installation instructions for the split bolts two conductors max per splice.

 05/18/2021DECK BONDJoe NievesDISAPPROVED - FEE5/17/2021 11:25:45 AM ST 5/18/2021 1:43:47 PM 1) The Equipotential Bond Conductor Must Be Installed 18 To 24 Inches From The Inside Walls Of The Pool. 2) The Bond Conductor Is To (Deep) 4To 6 Inch Maximum From The Underside Of The Deck. 3) The Bond Conductor Must Follow The Contour Of The Pool, And Be Installed In A (Neat And Workmanlike Manner). 4) Add Fill, Raise Conductor, And Straighten Bond Conductor. NEC 680.26 / 110.12

 05/21/2021DECK BONDJoe NievesAPPROVED5/20/2021 3:10:24 PM JS

 07/09/2021DECK STEEL/PAVERSJoseph RobinsonAPPROVED7/8/2021 12:25:42 PM JS

 08/06/2021SCREEN BONDCAP Gov ELDISAPPROVEDEXISTING #1610-01858/5/2021 11:03:25 AM JS 8/6/2021 2:55:25 PM LOOSE CONNECTIONSNEC 680.26(B)7

 08/12/2021FINAL SURVEYWyatt T. HaygoodAPPROVED

 09/13/2021SCREEN BONDJoe NievesDISAPPROVED9/10/2021 11:23:28 AM wth 9/13/2021 9:51:52 AM 1) The Bonding Lug @ Screen Must Be Copper, Copper Alloy Or Stainless Steel. 2) The Window Frames Must Be Bonded Into The Equipotential Bond Grid. NEC 680.7 NEC 680.26 (B) 7

 09/13/2021SCREEN ENCLOSUREWyatt T. HaygoodAPPROVEDEXISTING #1610-01859/10/2021 11:24:02 AM wth

 09/13/2021SAFETY ACT 515Wyatt T. HaygoodAPPROVED9/10/2021 11:23:10 AM wth

 09/21/2021ENG MISCPerry TabornAPPROVED9/17/2021 2:09:41 PM JS

 09/21/2021SCREEN BONDJoe NievesAPPROVED9/17/2021 2:09:25 PM JS

 10/19/2021ELECTRIC FINALDavid HayesAPPROVED10/18/2021 1:41:52 PM VB

 10/20/2021PLUMBING POOL FINALJeremy HassenplugDISAPPROVED10/19/2021 3:22:42 PM JS 10/20/2021 12:05:22 PM Piping needs to be labeled

 10/20/2021LANDSCAPINGPatti HootAPPROVED10/19/2021 3:22:33 PM JS 10/20/2021 2:38:43 PM Equipment is screened with podocarpus and roebelenii's installed in rear yard as replacement trees

 10/27/2021PLUMBING POOL FINALJeremy HassenplugAPPROVED10/26/2021 1:16:23 PM Request For Inspection City of Parkland Request for Inspection Form Permit Number 20080266 First Name michelle Last Name castillo Company PQS Pool & Patio Renovation Phone Number 3054690689 Email Address michelle@poolpatioreno.com Type of Inspection(s) Requested Plumbing Final Request Date 10/27/2021 Instructions/Example If you desire an inspection on the 28th, your request must be submitted by 4:00PM on the 27th. Additional Information Contractors can schedule inspections online by going to https://www.cityofparkland.org/epermit. If you are a contractor and do not have access to eTRAKiT please contact the Building Department to get directions for scheduling inspections online. Contractors can cancel inspections online up to 6:00am via the online portal. Same day inspection cancellations you must contact the Building Department via telephone between 7:30 and 8:00 AM at 954.753.5447.

 10/29/2021FINAL**Alejandro CorralesDISAPPROVED10/28/2021 1:13:28 PM MT 10/29/2021 5:31:08 PM 1) Screen enclosure door no longer self-closing and self-latching due to paver elevation outside of screen door. Reset these pavers and reschedule

 11/04/2021FINAL**Alejandro CorralesAPPROVED11/3/2021 1:44:32 PM MT